FIRE STATION NO.6 in League City, TX

7503 SOUTH SHORE BLVD., League City, TX, 77539

Construction complete · Sep 2019Inspection Complete

FIRE STATION NO.6 is a new construction project at 7503 SOUTH SHORE BLVD., League City, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2019). The project has an estimated value of $4.2M.

Estimated project value
$4.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 16, 2018503 days across supplied datesSep 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    107 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    396 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77539 (League City)

One email per change. Unsubscribe in one click. Privacy.

FIRE STATION NO.6 is a New Construction project located at 7503 SOUTH SHORE BLVD., League City, TX 77539 in League City, Texas. The project has an estimated value of $4.2M. CITY OF LEAGUE CITY is the property owner and NATEX ARCHITECTS is the design firm of record. The project was registered with TDLR on April 16, 2018.

Frequently Asked Questions

What is FIRE STATION NO.6?

FIRE STATION NO.6 is a new construction project at 7503 SOUTH SHORE BLVD. in League City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Proect consists of new construction of approximately 11,300sf Fire Station in League City. To include, apparatus

Is FIRE STATION NO.6 open in League City?

Construction on FIRE STATION NO.6 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2019. The building is finished and very likely open.

Where is FIRE STATION NO.6 located?

FIRE STATION NO.6 is located at 7503 SOUTH SHORE BLVD., League City, TX, 77539, in Galveston County.

Who is the owner or developer of FIRE STATION NO.6?

CITY OF LEAGUE CITY is the property owner/developer of record for FIRE STATION NO.6, per its TDLR project registration.

Who is the architect or design firm for FIRE STATION NO.6?

NATEX ARCHITECTS is the design firm of record for FIRE STATION NO.6, according to its TDLR filing.

How much does FIRE STATION NO.6 cost and how big is it?

FIRE STATION NO.6 has an estimated construction value of $4.2M, based on its TDLR filing.

Scope of Work

Proect consists of new construction of approximately 11,300sf Fire Station in League City. To include, apparatus

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7503 SOUTH SHORE BLVD., League City, TX, 77539

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77539 (League City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in League City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.