Project intelligenceTDLR EABPRJB8815790Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BORGER ISD HIGH SCHOOL RENOVATIONS

600 WEST FIRST STREET, Borger, TX, 79007

Construction complete · Apr 2021Project Closed

BORGER ISD HIGH SCHOOL RENOVATIONS is a renovation/alteration project at 600 WEST FIRST STREET, Borger, in Hutchinson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2021). The project has an estimated value of $8.6M across about 154,395 sq ft.

Estimated project value
$8.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
154,395 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$56/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 26, 20181,100 days across supplied datesApr 30, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    66 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    1,034 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79007 (Borger)

One email per change. Unsubscribe in one click. Privacy.

BORGER ISD HIGH SCHOOL RENOVATIONS is a Renovation/Alteration project located at 600 WEST FIRST STREET, Borger, TX 79007 in Borger, Texas. The project has an estimated value of $8.6M covering 154,395 sq ft. BORGER INDEPENDENT SCHOOL DISTRICT is the property owner and PARKHILL SMITH & COOPER INC. is the design firm of record. The project was registered with TDLR on April 26, 2018.

Frequently Asked Questions

What is BORGER ISD HIGH SCHOOL RENOVATIONS?

BORGER ISD HIGH SCHOOL RENOVATIONS is a renovation/alteration project at 600 WEST FIRST STREET in Borger, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing facility (corridors, classrooms,toilets, etc.) using standard construction methods.

Is BORGER ISD HIGH SCHOOL RENOVATIONS open in Borger?

Construction on BORGER ISD HIGH SCHOOL RENOVATIONS is complete — TDLR records show the project passed its required accessibility inspection in Apr 2021. The building is finished and very likely open.

Where is BORGER ISD HIGH SCHOOL RENOVATIONS located?

BORGER ISD HIGH SCHOOL RENOVATIONS is located at 600 WEST FIRST STREET, Borger, TX, 79007, in Hutchinson County.

Who is the owner or developer of BORGER ISD HIGH SCHOOL RENOVATIONS?

BORGER INDEPENDENT SCHOOL DISTRICT is the property owner/developer of record for BORGER ISD HIGH SCHOOL RENOVATIONS, per its TDLR project registration.

Who is the architect or design firm for BORGER ISD HIGH SCHOOL RENOVATIONS?

PARKHILL SMITH & COOPER INC. is the design firm of record for BORGER ISD HIGH SCHOOL RENOVATIONS, according to its TDLR filing.

How much does BORGER ISD HIGH SCHOOL RENOVATIONS cost and how big is it?

BORGER ISD HIGH SCHOOL RENOVATIONS has an estimated construction value of $8.6M and approximately 154,395 square feet (about $56/sqft), based on its TDLR filing.

Scope of Work

Renovations to existing facility (corridors, classrooms,toilets, etc.) using standard construction methods.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

600 WEST FIRST STREET, Borger, TX, 79007

Loading location map…
35.66585, -101.39486

Watch all construction in 79007 (Borger)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.