APPLE RP09 - TEMP SPACE
APPLE RP09 - TEMP SPACE is a renovation/alteration project at 5300 RIATA PARK COURT, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $88K.
๐Project Metrics
TDLR #EABPRJB8815834Review Complete
Design review complete, construction may proceed
APPLE RP09 - TEMP SPACE is a Renovation/Alteration project located at 5300 RIATA PARK COURT, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $88K. KUCERA COMPANIES, THE is the property owner and STG DESIGN is the design firm of record. The project was registered with TDLR on April 26, 2018.
โFrequently Asked Questions
What is APPLE RP09 - TEMP SPACE?
APPLE RP09 - TEMP SPACE is a renovation/alteration project at 5300 RIATA PARK COURT in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Modifications to existing office space and entry areas
Is APPLE RP09 - TEMP SPACE open in Austin?
APPLE RP09 - TEMP SPACE is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is APPLE RP09 - TEMP SPACE located?
APPLE RP09 - TEMP SPACE is located at 5300 RIATA PARK COURT, Austin, TX, 78727, in Travis County.
Who is the owner or developer of APPLE RP09 - TEMP SPACE?
KUCERA COMPANIES, THE is the property owner/developer of record for APPLE RP09 - TEMP SPACE, per its TDLR project registration.
Who is the architect or design firm for APPLE RP09 - TEMP SPACE?
STG DESIGN is the design firm of record for APPLE RP09 - TEMP SPACE, according to its TDLR filing.
How much does APPLE RP09 - TEMP SPACE cost and how big is it?
APPLE RP09 - TEMP SPACE has an estimated construction value of $88K, based on its TDLR filing.
๐Scope of Work
Modifications to existing office space and entry areas
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 26, 2018
Review Complete
Apr 26, 2018
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$1.9M total๐Related City Permits
Building permits found at or near this location
Replacement of an existing water heater Change Out: Install/ Replace 50 gallon electric tank-type water heater.
Replacement of an existing water heater Navien 210A Tankless water Heater Location: Garage
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
Interior Remodel (Kitchen remodel with plumbing and electrical relocation and underground trenching window and door replacement new exterior sliding glass door) Conversion of an office into a bedroom by constructing a new interior wall and replacing the existing window to meet egress requirements.
TPO single ply recover. Remove existing TPO membrane install new 1/2 hd cover board rhino bond new80 mil membrane