GILBERT GAS STATION in Austin, TX

13029 FM 969, Austin, TX, 78725

Target date passed (May 2019)Review Complete

GILBERT GAS STATION is a new construction project at 13029 FM 969, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.4M.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 2018365 days across supplied datesMay 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    304 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78725 (Austin)

One email per change. Unsubscribe in one click. Privacy.

GILBERT GAS STATION is a New Construction project located at 13029 FM 969, Austin, TX 78725 in Austin, Texas. The project has an estimated value of $1.4M. 729 EAST SLAUGHTER LANE LTD is the property owner and ADOLFO ALATRISTE is the design firm of record. The project was registered with TDLR on May 1, 2018.

Frequently Asked Questions

What is GILBERT GAS STATION?

GILBERT GAS STATION is a new construction project at 13029 FM 969 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: gas station/convenience Store

Is GILBERT GAS STATION open in Austin?

GILBERT GAS STATION was scheduled to finish construction in May 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is GILBERT GAS STATION located?

GILBERT GAS STATION is located at 13029 FM 969, Austin, TX, 78725, in Travis County.

Who is the owner or developer of GILBERT GAS STATION?

729 EAST SLAUGHTER LANE LTD is the property owner/developer of record for GILBERT GAS STATION, per its TDLR project registration.

Who is the architect or design firm for GILBERT GAS STATION?

ADOLFO ALATRISTE is the design firm of record for GILBERT GAS STATION, according to its TDLR filing.

How much does GILBERT GAS STATION cost and how big is it?

GILBERT GAS STATION has an estimated construction value of $1.4M, based on its TDLR filing.

Scope of Work

gas station/convenience Store

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

13029 FM 969, Austin, TX, 78725

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

13029 HYMEADOW CIR

Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System

FinalMechanical PermitChange OutApr 2026
View Details
2026-047981 MP
Radiant Plumbing and Air Conditioning
13029 HYMEADOW CIR

Replacement of an existing water heater Replace 40-gallon Gas Water Heater Located: in Garage Attic

FinalPlumbing PermitChange OutMar 2026
View Details
2026-023196 PP
13029 PARTRIDGE BEND DR

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutSep 2025
View Details
2025-123668 MP
Alamo Austin Air Conditioning & Heating Inc
13029 SILVER CREEK DRIVE

request to disconnect install 200 amp ATS and 20KW generator

ExpiredElectrical PermitRepairDec 2024
View Details
2024-158110 EP
13029 DITKA DR

New Construction of SFR in ETJ

FinalPlumbing PermitNewOct 2024
View Details
2024-143662 PP
Accent Plumbing, Inc.

Watch all construction in 78725 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.