Project intelligenceTDLR EABPRJB8817193New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

NEW HIGH SCHOOL GYMNASIUM & BAND HALL

1306 FM43, Corpus Christi, TX, 78415

Construction complete · Jun 2019Project Closed

NEW HIGH SCHOOL GYMNASIUM & BAND HALL is a new construction project at 1306 FM43, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2019). The project has an estimated value of $7.0M.

Estimated project value
$7.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 15, 2018382 days across supplied datesJun 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    47 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    335 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78415 (Corpus Christi)

One email per change. Unsubscribe in one click. Privacy.

NEW HIGH SCHOOL GYMNASIUM & BAND HALL is a New Construction project located at 1306 FM43, Corpus Christi, TX 78415 in Corpus Christi, Texas. The project has an estimated value of $7.0M. LONDON I.S.D. is the property owner and CLK ARCHITECTS & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on May 15, 2018.

Frequently Asked Questions

What is NEW HIGH SCHOOL GYMNASIUM & BAND HALL?

NEW HIGH SCHOOL GYMNASIUM & BAND HALL is a new construction project at 1306 FM43 in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New High School Gymnasium and Band Hall to be attached to existing facility. Single story building, approximatel

Is NEW HIGH SCHOOL GYMNASIUM & BAND HALL open in Corpus Christi?

Construction on NEW HIGH SCHOOL GYMNASIUM & BAND HALL is complete — TDLR records show the project passed its required accessibility inspection in Jun 2019. The building is finished and very likely open.

Where is NEW HIGH SCHOOL GYMNASIUM & BAND HALL located?

NEW HIGH SCHOOL GYMNASIUM & BAND HALL is located at 1306 FM43, Corpus Christi, TX, 78415, in Nueces County.

Who is the owner or developer of NEW HIGH SCHOOL GYMNASIUM & BAND HALL?

LONDON I.S.D. is the property owner/developer of record for NEW HIGH SCHOOL GYMNASIUM & BAND HALL, per its TDLR project registration.

Who is the architect or design firm for NEW HIGH SCHOOL GYMNASIUM & BAND HALL?

CLK ARCHITECTS & ASSOCIATES INC. is the design firm of record for NEW HIGH SCHOOL GYMNASIUM & BAND HALL, according to its TDLR filing.

How much does NEW HIGH SCHOOL GYMNASIUM & BAND HALL cost and how big is it?

NEW HIGH SCHOOL GYMNASIUM & BAND HALL has an estimated construction value of $7.0M, based on its TDLR filing.

Scope of Work

New High School Gymnasium and Band Hall to be attached to existing facility. Single story building, approximatel

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1306 FM43, Corpus Christi, TX, 78415

Location by street address

Watch all construction in 78415 (Corpus Christi)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Corpus Christi?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.