SIDEWAYS BBQ
SIDEWAYS BBQ is a renovation/alteration project at 2067 SUMMER LEE DR Ste 105, Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $129K.
๐Project Metrics
TDLR #EABPRJB8817639Project Registered
Project has been registered with TDLR and is in pre-construction phase
SIDEWAYS BBQ is a Renovation/Alteration project located at 2067 SUMMER LEE DR Ste 105, Rockwall, TX 75032 in Rockwall, Texas. The project has an estimated value of $129K. PEGASUSABLON is the property owner and ONE STOP CONTRACTING is the design firm of record. The project was registered with TDLR on May 22, 2018.
โFrequently Asked Questions
What is SIDEWAYS BBQ?
SIDEWAYS BBQ is a renovation/alteration project at 2067 SUMMER LEE DR Ste 105 in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing building space.
Is SIDEWAYS BBQ open in Rockwall?
SIDEWAYS BBQ is currently under construction in Rockwall, TX. Its current TDLR status is "Project Registered".
Where is SIDEWAYS BBQ located?
SIDEWAYS BBQ is located at 2067 SUMMER LEE DR Ste 105, Rockwall, TX, 75032, in Rockwall County.
Who is the owner or developer of SIDEWAYS BBQ?
PEGASUSABLON is the property owner/developer of record for SIDEWAYS BBQ, per its TDLR project registration.
Who is the architect or design firm for SIDEWAYS BBQ?
ONE STOP CONTRACTING is the design firm of record for SIDEWAYS BBQ, according to its TDLR filing.
How much does SIDEWAYS BBQ cost and how big is it?
SIDEWAYS BBQ has an estimated construction value of $129K, based on its TDLR filing.
๐Scope of Work
Renovation of existing building space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 22, 2018
Review Complete
Inspection Complete
Closed