Project intelligenceTDLR EABPRJB8818823New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

GLENWOOD STREET AND DRAINAGE IMPROVEMENT in El Paso, TX

170 - 250 BLOCK OF GLENWOOD ST, El Paso, TX, 79905

Target date passed (Aug 2019)Review Complete

GLENWOOD STREET AND DRAINAGE IMPROVEMENT is a new construction project at 170 - 250 BLOCK OF GLENWOOD ST, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.1M.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 6, 2018421 days across supplied datesAug 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    87 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    334 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79905 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

GLENWOOD STREET AND DRAINAGE IMPROVEMENT is a New Construction project located at 170 - 250 BLOCK OF GLENWOOD ST, El Paso, TX 79905 in El Paso, Texas. The project has an estimated value of $1.1M. CITY OF EL PASO is the property owner and CSA DESIGN GROUP INC. is the design firm of record. The project was registered with TDLR on June 6, 2018.

Frequently Asked Questions

What is GLENWOOD STREET AND DRAINAGE IMPROVEMENT?

GLENWOOD STREET AND DRAINAGE IMPROVEMENT is a new construction project at 170 - 250 BLOCK OF GLENWOOD ST in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal and replacement of existing pavement, installation of new sidewalks, installation of ADA accessible curb

Is GLENWOOD STREET AND DRAINAGE IMPROVEMENT open in El Paso?

GLENWOOD STREET AND DRAINAGE IMPROVEMENT was scheduled to finish construction in Aug 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is GLENWOOD STREET AND DRAINAGE IMPROVEMENT located?

GLENWOOD STREET AND DRAINAGE IMPROVEMENT is located at 170 - 250 BLOCK OF GLENWOOD ST, El Paso, TX, 79905, in El Paso County.

Who is the owner or developer of GLENWOOD STREET AND DRAINAGE IMPROVEMENT?

CITY OF EL PASO is the property owner/developer of record for GLENWOOD STREET AND DRAINAGE IMPROVEMENT, per its TDLR project registration.

Who is the architect or design firm for GLENWOOD STREET AND DRAINAGE IMPROVEMENT?

CSA DESIGN GROUP INC. is the design firm of record for GLENWOOD STREET AND DRAINAGE IMPROVEMENT, according to its TDLR filing.

How much does GLENWOOD STREET AND DRAINAGE IMPROVEMENT cost and how big is it?

GLENWOOD STREET AND DRAINAGE IMPROVEMENT has an estimated construction value of $1.1M, based on its TDLR filing.

Scope of Work

Removal and replacement of existing pavement, installation of new sidewalks, installation of ADA accessible curb

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

170 - 250 BLOCK OF GLENWOOD ST, El Paso, TX, 79905

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 79905 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.