3 BAY ADDITION
3 BAY ADDITION is a additions to existing building project at 2525 EAST ABRAM, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $4.1M.
๐Project Metrics
TDLR #EABPRJB8818954Project Closed
Project has been completed and closed
3 BAY ADDITION is a Additions to Existing Building project located at 2525 EAST ABRAM, Arlington, TX 76010 in Arlington, Texas. The project has an estimated value of $4.1M. GM ARLINGTON ASSEMBLY PLANT is the property owner and GHAFARI ASSOCIATES is the design firm of record. The project was registered with TDLR on June 7, 2018.
โFrequently Asked Questions
What is 3 BAY ADDITION?
3 BAY ADDITION is a additions to existing building project at 2525 EAST ABRAM in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition to existing facility of roughly 6,7075 SF loading dock.
Is 3 BAY ADDITION open in Arlington?
Construction on 3 BAY ADDITION is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
Where is 3 BAY ADDITION located?
3 BAY ADDITION is located at 2525 EAST ABRAM, Arlington, TX, 76010, in Tarrant County.
Who is the owner or developer of 3 BAY ADDITION?
GM ARLINGTON ASSEMBLY PLANT is the property owner/developer of record for 3 BAY ADDITION, per its TDLR project registration.
Who is the architect or design firm for 3 BAY ADDITION?
GHAFARI ASSOCIATES is the design firm of record for 3 BAY ADDITION, according to its TDLR filing.
How much does 3 BAY ADDITION cost and how big is it?
3 BAY ADDITION has an estimated construction value of $4.1M, based on its TDLR filing.
๐Scope of Work
Addition to existing facility of roughly 6,7075 SF loading dock.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 7, 2018
Review Complete
Inspection Complete
Closed
Dec 1, 2018