Project intelligenceTDLR EABPRJB8819235New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

VISTA WAY PAVING/DRAINAGE

NONE, Benbrook, TX, 76126

Construction complete · Aug 2018Project Closed

VISTA WAY PAVING/DRAINAGE is a new construction project at NONE, Benbrook, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2018). The project has an estimated value of $3.3M.

Estimated project value
$3.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 12, 201850 days across supplied datesAug 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76126 (Benbrook)

One email per change. Unsubscribe in one click. Privacy.

VISTA WAY PAVING/DRAINAGE is a New Construction project located at NONE, Benbrook, TX 76126 in Benbrook, Texas. The project has an estimated value of $3.3M. CITY OF BENBROOK TEXAS is the property owner and DUNAWAY ASSOCIATES is the design firm of record. The project was registered with TDLR on June 12, 2018.

Frequently Asked Questions

What is VISTA WAY PAVING/DRAINAGE?

VISTA WAY PAVING/DRAINAGE is a new construction project at NONE in Benbrook, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Street, Water, Sewer, Storm Drain and Sidewalk.

Is VISTA WAY PAVING/DRAINAGE open in Benbrook?

Construction on VISTA WAY PAVING/DRAINAGE is complete — TDLR records show the project passed its required accessibility inspection in Aug 2018. The building is finished and very likely open.

Where is VISTA WAY PAVING/DRAINAGE located?

VISTA WAY PAVING/DRAINAGE is located at NONE, Benbrook, TX, 76126, in Tarrant County.

Who is the owner or developer of VISTA WAY PAVING/DRAINAGE?

CITY OF BENBROOK TEXAS is the property owner/developer of record for VISTA WAY PAVING/DRAINAGE, per its TDLR project registration.

Who is the architect or design firm for VISTA WAY PAVING/DRAINAGE?

DUNAWAY ASSOCIATES is the design firm of record for VISTA WAY PAVING/DRAINAGE, according to its TDLR filing.

How much does VISTA WAY PAVING/DRAINAGE cost and how big is it?

VISTA WAY PAVING/DRAINAGE has an estimated construction value of $3.3M, based on its TDLR filing.

Scope of Work

New Street, Water, Sewer, Storm Drain and Sidewalk.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

NONE, Benbrook, TX, 76126

Location by street address

Watch all construction in 76126 (Benbrook)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Benbrook?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.