Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Under construction๐Ÿ“‹Project Registered๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

GOOGLE 100 CONGRESS

100 CONGRESS AVE. SUITE 200, Austin, TX 78701, Austin, TX, 78701
Pre-Construction15%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8819304
$500K
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
1 months
Duration
Registered:Jun 12, 2018
Start:Jul 1, 2018
Target:Aug 1, 2018
๐Ÿ“‹

Project Registered

Project has been registered with TDLR and is in pre-construction phase

GOOGLE 100 CONGRESS is a Renovation/Alteration project located at 100 CONGRESS AVE. SUITE 200, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $500K. CBRE ASSET SERVOCES is the property owner and CTA ARCHITECTS ENGINEERS is the design firm of record. The project was registered with TDLR on June 12, 2018.

๐Ÿ“‹Scope of Work

The minor renovations of interior non-structural partitions and associated mechanical and electrical systems occ

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
June 12, 2018
Construction Start
July 1, 2018
Expected Completion
August 1, 2018

๐Ÿ“…Project Timeline

Filed

Jun 12, 2018

Review Complete

Inspection Complete

Closed

๐Ÿ”—Related Projects

๐Ÿ›๏ธSame Design Firm

$206.2M total
PS2-1 CAFETERIA COMPOSTING STATIONS
Austinยท$55K
WHOLE FOODS - KIRBY REMODEL 2018
Houstonยท$750K
WHOLE FOODS - COLLEYVILLE REMODEL 2018
Colleyvilleยท$157K

๐Ÿ“„Related City Permits

Building permits found at or near this location

1008 BRICKELL LOOP UNIT B

Home builders loop Ref: 2026-015218 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065813 EP
๐Ÿ”งIn Charge Electrical Services
1008 BRICKELL LOOP UNIT A

Home builders loop Ref: 2026-015217 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065814 EP
๐Ÿ”งIn Charge Electrical Services
1008 SPENCE ST BLDG 2

BLDG #2 New 2-Story dwelling unit 2 Bed/2 Bath with attached carports covered patio and balcony new alley driveway (Two Unit Use)

ActiveElectrical PermitNewJun 2026
View Details
2024-134720 EP
๐Ÿ”งAtex Electrical Services
1008 SPENCE ST

Addition/remodel. 2-story addition to existing noncomplying 1-story dwelling unit. Addition will consist of an enlarged living room enlarged kitchen utility room half bathroom and covered patio to 1st floor and three bedrooms and two bathrooms to 2nd floor. Reconfigure interior layout resulting in a 3 bedroom 2.5 bathroom dwelling unit.

ActiveElectrical PermitAddition and RemodelJun 2026
View Details
2024-146356 EP
๐Ÿ”งAtex Electrical Services
1008 HARWOOD PL

Updated: meter pull to cut power requiring only the temporary pull of the meter itself. There will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. We only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. Remove meter to cut power to the house. Replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. Reinstall meter to re-establish power to the house.

ActiveElectrical PermitRepairJun 2026
View Details
2026-063987 EP
๐Ÿ”งMGR Services LLC

Quick Actions

View on TDLR
TDLR ID: EABPRJB8819304

Property Owner

๐Ÿ‘ค
CBRE ASSET SERVOCES (Austin)
Contact: Registered by TDLR
23 projects ยท $22.5M
View company profile
WAYNE COURREGES III, CPM 100 CONGRESS AVE., SUITE 230, AUSTIN, TX 78701
(512) 322-3200

Design Firm

๐Ÿ›๏ธ
CTA Architects Engineers
122 projects ยท $206.2M
View company profile
BRAD THIGPEN 3601 S. CONGRESS AVE STE 1000, AUSTIN, TX 78074
(512) 804-1210

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78701
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects