Project intelligenceTDLR EABPRJB8819809New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE in Katy, TX

GABLE HOLLOW LN & SPRING BEND, Katy, TX, 77450

Target date passed (Dec 2018)Review Complete

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE is a new construction project at GABLE HOLLOW LN & SPRING BEND, Katy, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2018 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $250K.

Estimated project value
$250K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 19, 2018165 days across supplied datesDec 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    43 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77450 (Katy)

One email per change. Unsubscribe in one click. Privacy.

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE is a New Construction project located at GABLE HOLLOW LN & SPRING BEND, Katy, TX 77450 in Katy, Texas. The project has an estimated value of $250K. MEMORIAL M.U.D. is the property owner and COSTELLO INC. is the design firm of record. The project was registered with TDLR on June 19, 2018.

Frequently Asked Questions

What is MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE?

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE is a new construction project at GABLE HOLLOW LN & SPRING BEND in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction improvements: community sidewalks, pedestrian bridge, site lighting, planting and irrigation.

Is MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE open in Katy?

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE was scheduled to finish construction in Dec 2018 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE located?

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE is located at GABLE HOLLOW LN & SPRING BEND, Katy, TX, 77450, in Harris County.

Who is the owner or developer of MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE?

MEMORIAL M.U.D. is the property owner/developer of record for MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE, per its TDLR project registration.

Who is the architect or design firm for MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE?

COSTELLO INC. is the design firm of record for MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE, according to its TDLR filing.

How much does MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE cost and how big is it?

MEMORIAL M.U.D PEDESTRIAN TRAIL & BRIDGE has an estimated construction value of $250K, based on its TDLR filing.

Scope of Work

New construction improvements: community sidewalks, pedestrian bridge, site lighting, planting and irrigation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

GABLE HOLLOW LN & SPRING BEND, Katy, TX, 77450

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77450 (Katy)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.