Project intelligenceTDLR EABPRJB8819973Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

BISD SIXTH GRADE WING RENOVATIONS in Burkburnett, TX

102 SOUTH AVENUE D, Burkburnett, TX, 76354

Construction complete · Sep 2018Inspection Complete

BISD SIXTH GRADE WING RENOVATIONS is a renovation/alteration project at 102 SOUTH AVENUE D, Burkburnett, in Wichita County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $65K.

Estimated project value
$65K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 21, 201872 days across supplied datesSep 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    10 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76354 (Burkburnett)

One email per change. Unsubscribe in one click. Privacy.

BISD SIXTH GRADE WING RENOVATIONS is a Renovation/Alteration project located at 102 SOUTH AVENUE D, Burkburnett, TX 76354 in Burkburnett, Texas. The project has an estimated value of $65K. BURKBURNETT ISD is the property owner and BYSP ARCHITECTS is the design firm of record. The project was registered with TDLR on June 21, 2018.

Frequently Asked Questions

What is BISD SIXTH GRADE WING RENOVATIONS?

BISD SIXTH GRADE WING RENOVATIONS is a renovation/alteration project at 102 SOUTH AVENUE D in Burkburnett, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installing accessible ramp at entrance. Converting twoclassrooms into two locker rooms.

Is BISD SIXTH GRADE WING RENOVATIONS open in Burkburnett?

Construction on BISD SIXTH GRADE WING RENOVATIONS is complete — TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.

Where is BISD SIXTH GRADE WING RENOVATIONS located?

BISD SIXTH GRADE WING RENOVATIONS is located at 102 SOUTH AVENUE D, Burkburnett, TX, 76354, in Wichita County.

Who is the owner or developer of BISD SIXTH GRADE WING RENOVATIONS?

BURKBURNETT ISD is the property owner/developer of record for BISD SIXTH GRADE WING RENOVATIONS, per its TDLR project registration.

Who is the architect or design firm for BISD SIXTH GRADE WING RENOVATIONS?

BYSP ARCHITECTS is the design firm of record for BISD SIXTH GRADE WING RENOVATIONS, according to its TDLR filing.

How much does BISD SIXTH GRADE WING RENOVATIONS cost and how big is it?

BISD SIXTH GRADE WING RENOVATIONS has an estimated construction value of $65K, based on its TDLR filing.

Scope of Work

Installing accessible ramp at entrance. Converting twoclassrooms into two locker rooms.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

102 SOUTH AVENUE D, Burkburnett, TX, 76354

Loading location map…
34.09332, -98.56923

Watch all construction in 76354 (Burkburnett)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Burkburnett?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.