GOLFTEC AUSTIN- STECK is a renovation/alteration project at 3301 STECK AVE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $120K.
Final inspection completed, awaiting project closure
GOLFTEC AUSTIN- STECK is a Renovation/Alteration project located at 3301 STECK AVE, Austin, TX 78757 in Austin, Texas. The project has an estimated value of $120K. DENVER is the property owner and GOLFTEC is the design firm of record. The project was registered with TDLR on June 27, 2018.
GOLFTEC AUSTIN- STECK is a renovation/alteration project at 3301 STECK AVE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: COMMERCIAL TENANT IMPROVEMENT WITHIN THE EXISTING STRUCTURE LOCATED AT 3301 STECK AVE., AUSTIN, TX 78757, TO A G
Construction on GOLFTEC AUSTIN- STECK is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
GOLFTEC AUSTIN- STECK is located at 3301 STECK AVE, Austin, TX, 78757, in Travis County.
DENVER is the property owner/developer of record for GOLFTEC AUSTIN- STECK, per its TDLR project registration.
GOLFTEC is the design firm of record for GOLFTEC AUSTIN- STECK, according to its TDLR filing.
GOLFTEC AUSTIN- STECK has an estimated construction value of $120K, based on its TDLR filing.
COMMERCIAL TENANT IMPROVEMENT WITHIN THE EXISTING STRUCTURE LOCATED AT 3301 STECK AVE., AUSTIN, TX 78757, TO A G
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 27, 2018
Review Complete
Inspection Complete
Dec 1, 2018
Closed
Building permits found at or near this location
Interior Remodel - no increase in square footage. The project will include new sheathing exterior insulation and rainscreen cladding. The project will also be adding slab edge insulation additional rafters for added insulation and exterior top side roof insulation. The home will be all electric. Existing gas line will be abandoned at the street. Also to include: detaching the garage efficient windows and doors new high efficiency mechanical systems all new plumbing and electrical new landscape pavers new wood deck prewire for future solar. All expired permits will be resolved as part of this renovation
Prewire for Solar
Prewire for Solar
T18 - Replace entry deck with a new composite deck. Foot print will not change. Add deck around pool. Pool done by other contractor.
Set up electrical power50amps for portable hot tub