SHIPLEY DO-NUTS
SHIPLEY DO-NUTS is a renovation/alteration project at 4001 BUFFALO GAP RD, Abilene, in Taylor County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB8821862Project Closed
Project has been completed and closed
SHIPLEY DO-NUTS is a Renovation/Alteration project located at 4001 BUFFALO GAP RD, Abilene, TX 79605 in Abilene, Texas. The project has an estimated value of $200K. Shipleys Donuts is the property owner and C.M. ARCHITECTURE P.A. is the design firm of record. The project was registered with TDLR on July 18, 2018.
โFrequently Asked Questions
What is SHIPLEY DO-NUTS?
SHIPLEY DO-NUTS is a renovation/alteration project at 4001 BUFFALO GAP RD in Abilene, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant fit out of an existing shell building for a donutshop with an adjacent office space.
Is SHIPLEY DO-NUTS open in Abilene?
Construction on SHIPLEY DO-NUTS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
Where is SHIPLEY DO-NUTS located?
SHIPLEY DO-NUTS is located at 4001 BUFFALO GAP RD, Abilene, TX, 79605, in Taylor County.
Who is the owner or developer of SHIPLEY DO-NUTS?
Shipleys Donuts is the property owner/developer of record for SHIPLEY DO-NUTS, per its TDLR project registration.
Who is the architect or design firm for SHIPLEY DO-NUTS?
C.M. ARCHITECTURE P.A. is the design firm of record for SHIPLEY DO-NUTS, according to its TDLR filing.
How much does SHIPLEY DO-NUTS cost and how big is it?
SHIPLEY DO-NUTS has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Tenant fit out of an existing shell building for a donutshop with an adjacent office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 18, 2018
Review Complete
Inspection Complete
Closed
Dec 1, 2018