Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Williamson
Construction complete ยท Oct 2019๐ŸProject Closed๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project is privately funded, on private land for private use.

2ND & MAIN LOFTS

100 E. 2ND STREET, Taylor, TX 76574, Taylor, TX, 76574
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB8822655
$1.5M
Project Value
1,550
Square Feet
$968/sqft
Cost/SqFt
1y 2mo
Duration
Registered:Jul 30, 2018
Start:Sep 1, 2018
Target:Oct 31, 2019
๐Ÿ

Project Closed

Project has been completed and closed

2ND & MAIN LOFTS is a Renovation/Alteration project located at 100 E. 2ND STREET, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $1.5M covering 1,550 sq ft. DOUG MOSS is the property owner and HOLZMAN MOSS BOTTINO ARCHITECTURE is the design firm of record. The project was registered with TDLR on July 30, 2018.

๐Ÿ“‹Scope of Work

Turning empty old two story building into apartments forrent. Includes overhaul of failing facade and complete

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 30, 2018
Project Closed
October 31, 2019
Construction Start
September 1, 2018
Expected Completion
October 31, 2019

๐Ÿ“…Project Timeline

Filed

Jul 30, 2018

Review Complete

Inspection Complete

Closed

Oct 31, 2019

๐Ÿ”—Related Projects

๐Ÿ›๏ธSame Design Firm

$8.0M total
MIDWESTERN STATE UNIVERSITY
Wichita Fallsยท$4.5M
MSU-MOFFETT LIBRARY RENOVATION, PHASE I
Wichita Fallsยท$2.0M

๐Ÿ“„Related City Permits

Building permits found at or near this location

1008 BRICKELL LOOP UNIT B

Home builders loop Ref: 2026-015218 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065813 EP
๐Ÿ”งIn Charge Electrical Services
1008 BRICKELL LOOP UNIT A

Home builders loop Ref: 2026-015217 EP

FinalElectrical PermitHomebuilder LoopJun 2026
View Details
2026-065814 EP
๐Ÿ”งIn Charge Electrical Services
1008 SPENCE ST BLDG 2

BLDG #2 New 2-Story dwelling unit 2 Bed/2 Bath with attached carports covered patio and balcony new alley driveway (Two Unit Use)

ActiveElectrical PermitNewJun 2026
View Details
2024-134720 EP
๐Ÿ”งAtex Electrical Services
1008 SPENCE ST

Addition/remodel. 2-story addition to existing noncomplying 1-story dwelling unit. Addition will consist of an enlarged living room enlarged kitchen utility room half bathroom and covered patio to 1st floor and three bedrooms and two bathrooms to 2nd floor. Reconfigure interior layout resulting in a 3 bedroom 2.5 bathroom dwelling unit.

ActiveElectrical PermitAddition and RemodelJun 2026
View Details
2024-146356 EP
๐Ÿ”งAtex Electrical Services
1008 HARWOOD PL

Updated: meter pull to cut power requiring only the temporary pull of the meter itself. There will be no manipulation or removal of the meter can enclosure or service wires from transformer to meter whatsoever. We only need to pull the meter itself to cut power to the wires feeding the homes main panel in order to install the battery disconnect upstream of the homes main panel. Remove meter to cut power to the house. Replace main panel and install electrical automatic transfer switch for subsequent battery backup system install. Reinstall meter to re-establish power to the house.

ActiveElectrical PermitRepairJun 2026
View Details
2026-063987 EP
๐Ÿ”งMGR Services LLC

Quick Actions

View on TDLR
TDLR ID: EABPRJB8822655

Property Owner

๐Ÿ‘ค
DOUG MOSS
Contact: Emmett Rogers
View all projects
DARWIN HARRISON 812 GEORGE ST., TAYLOR, TX 76574
(917) 576-7044

Design Firm

๐Ÿ›๏ธ
HOLZMAN MOSS BOTTINO ARCHITECTURE
3 projects ยท $8.0M
View company profile
DOG MOSS 90 BROAD STREET, SUITE 1803, NEW YORK, NY 10004
(212) 465-0808

Registered Accessibility Specialist

๐Ÿ“‹
LANDY,PERKINS
RAS #371
6013 86TH ST, LUBBOCK, TX 79424
(806) 543-1873

Explore Area

๐Ÿ™๏ธ
Taylor
View city projects
๐Ÿ—บ๏ธ
Williamson County
View county projects
๐Ÿ“ฎ
ZIP 76574
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Taylor
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Taylor
Home & commercial builders
๐Ÿ“
Architects in Taylor
Architecture & design firms

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects