JIMMY JOHNS
JIMMY JOHNS is a renovation/alteration project at 1713 FM 685, UNIT 110, Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2018). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB8823061Project Closed
Project has been completed and closed
JIMMY JOHNS is a Renovation/Alteration project located at 1713 FM 685, UNIT 110, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $200K. 1713 PARKWAY LLC is the property owner and C.M. ARCHITECTURE is the design firm of record. The project was registered with TDLR on August 3, 2018.
โFrequently Asked Questions
What is JIMMY JOHNS?
JIMMY JOHNS is a renovation/alteration project at 1713 FM 685, UNIT 110 in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Jimmy Johns sandwich shop occupying a space withing a portion of an existing building.
Is JIMMY JOHNS open in Pflugerville?
Construction on JIMMY JOHNS is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2018. The building is finished and very likely open.
Where is JIMMY JOHNS located?
JIMMY JOHNS is located at 1713 FM 685, UNIT 110, Pflugerville, TX, 78660, in Travis County.
Who is the owner or developer of JIMMY JOHNS?
1713 PARKWAY LLC is the property owner/developer of record for JIMMY JOHNS, per its TDLR project registration.
Who is the architect or design firm for JIMMY JOHNS?
C.M. ARCHITECTURE is the design firm of record for JIMMY JOHNS, according to its TDLR filing.
How much does JIMMY JOHNS cost and how big is it?
JIMMY JOHNS has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Jimmy Johns sandwich shop occupying a space withing a portion of an existing building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 3, 2018
Review Complete
Inspection Complete
Closed
Oct 1, 2018
๐Related Projects
๐คSame Owner
$2.0M total๐๏ธSame Design Firm
$7.80B total๐Related City Permits
Building permits found at or near this location
Replace existing 5 ton package unit with new 5 ton package unit replace curb adapter. Gas heat.
Update/upgrade existing outages overhead service to a 200 amp service with updated ground and riser.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replace sewer yard line from house connection to City tap.
Express- Foundation Repair