DXL
DXL is a renovation/alteration project at 4015 INTERSTATE HIGHWAY 35, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2018). The project has an estimated value of $175K.
๐Project Metrics
TDLR #EABPRJB7806006Project Closed
Project has been completed and closed
DXL is a Renovation/Alteration project located at 4015 INTERSTATE HIGHWAY 35, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $175K. DESTINATION XL GROUP is the property owner and C.M. ARCHITECTURE is the design firm of record. The project was registered with TDLR on December 5, 2016.
โFrequently Asked Questions
What is DXL?
DXL is a renovation/alteration project at 4015 INTERSTATE HIGHWAY 35 in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior build-out of tenant space, includes interior finishes, lighting
Is DXL open in San Marcos?
Construction on DXL is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2018. The building is finished and very likely open.
Where is DXL located?
DXL is located at 4015 INTERSTATE HIGHWAY 35, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of DXL?
DESTINATION XL GROUP is the property owner/developer of record for DXL, per its TDLR project registration.
Who is the architect or design firm for DXL?
C.M. ARCHITECTURE is the design firm of record for DXL, according to its TDLR filing.
How much does DXL cost and how big is it?
DXL has an estimated construction value of $175K, based on its TDLR filing.
๐Scope of Work
Interior build-out of tenant space, includes interior finishes, lighting
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 5, 2016
Review Complete
Inspection Complete
Closed
Sep 30, 2018
๐Related Projects
๐๏ธSame Design Firm
$7.80B total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump System
Express: replace 17 windows
Expedited Review - New Construction of a 2-Story Secondary Apartment [2bed 2bath]
Expedited Review - New Construction of a 2-Story Single Family Res. [3bed 3.5bath] with Habitable Attic and attached 1-car Garage
New pool