Project intelligenceTDLR EABPRJB8823106New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS

ROCHELLE-BROCKBANK-VASSAR, Irving, TX, 75060

Target date passed (Apr 2020)Review Complete

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS is a new construction project at ROCHELLE-BROCKBANK-VASSAR, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $124K.

Estimated project value
$124K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 9mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2018640 days across supplied datesApr 1, 2020

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    606 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75060 (Irving)

One email per change. Unsubscribe in one click. Privacy.

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS is a New Construction project located at ROCHELLE-BROCKBANK-VASSAR, Irving, TX 75060 in Irving, Texas. The project has an estimated value of $124K. CITY OF IRVING is the property owner and CITY OF IRVING | CIP DEPARTMENT is the design firm of record. The project was registered with TDLR on August 4, 2018.

Frequently Asked Questions

What is 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS?

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS is a new construction project at ROCHELLE-BROCKBANK-VASSAR in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install new W & WW mains in city row.

Is 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS open in Irving?

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS was scheduled to finish construction in Apr 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS located?

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS is located at ROCHELLE-BROCKBANK-VASSAR, Irving, TX, 75060, in Dallas County.

Who is the owner or developer of 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS?

CITY OF IRVING is the property owner/developer of record for 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS, per its TDLR project registration.

Who is the architect or design firm for 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS?

CITY OF IRVING | CIP DEPARTMENT is the design firm of record for 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS, according to its TDLR filing.

How much does 120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS cost and how big is it?

120D-18F RBVS-3 ALLEYS W-WW IMPROVEMENTS has an estimated construction value of $124K, based on its TDLR filing.

Scope of Work

Install new W & WW mains in city row.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

ROCHELLE-BROCKBANK-VASSAR, Irving, TX, 75060

Location by street address

Watch all construction in 75060 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.