3RD FLOOR SPEC SUITES
3RD FLOOR SPEC SUITES is a renovation/alteration project at 4441 W. AIRPORT FRWY. 3rd Floor, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $503K.
๐Project Metrics
TDLR #EABPRJB8823160Review Complete
Design review complete, construction may proceed
3RD FLOOR SPEC SUITES is a Renovation/Alteration project located at 4441 W. AIRPORT FRWY. 3rd Floor, Irving, TX 75062 in Irving, Texas. The project has an estimated value of $503K. NATURON PROPERTIES LLC is the property owner and MERCER GROUP LLC is the design firm of record. The project was registered with TDLR on August 6, 2018.
โFrequently Asked Questions
What is 3RD FLOOR SPEC SUITES?
3RD FLOOR SPEC SUITES is a renovation/alteration project at 4441 W. AIRPORT FRWY. 3rd Floor in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Tenant Finish Out
Is 3RD FLOOR SPEC SUITES open in Irving?
3RD FLOOR SPEC SUITES is currently under construction in Irving, TX. Its current TDLR status is "Review Complete".
Where is 3RD FLOOR SPEC SUITES located?
3RD FLOOR SPEC SUITES is located at 4441 W. AIRPORT FRWY. 3rd Floor, Irving, TX, 75062, in Dallas County.
Who is the owner or developer of 3RD FLOOR SPEC SUITES?
NATURON PROPERTIES LLC is the property owner/developer of record for 3RD FLOOR SPEC SUITES, per its TDLR project registration.
Who is the architect or design firm for 3RD FLOOR SPEC SUITES?
MERCER GROUP LLC is the design firm of record for 3RD FLOOR SPEC SUITES, according to its TDLR filing.
How much does 3RD FLOOR SPEC SUITES cost and how big is it?
3RD FLOOR SPEC SUITES has an estimated construction value of $503K, based on its TDLR filing.
๐Scope of Work
Interior Tenant Finish Out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 6, 2018
Review Complete
Aug 6, 2018
Inspection Complete
Closed