QUIKTRIP #4014
QUIKTRIP #4014 is a new construction project at 9110 TARPON DR, Boerne, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2019). The project has an estimated value of $375K across about 1 sq ft.
๐Project Metrics
TDLR #EABPRJB8823761Project Closed
Project has been completed and closed
QUIKTRIP #4014 is a New Construction project located at 9110 TARPON DR, Boerne, TX 78006 in Boerne, Texas. The project has an estimated value of $375K covering 1 sq ft. QT SOUTH LLC is the property owner and DANIEL D. FILUK is the design firm of record. The project was registered with TDLR on August 14, 2018.
โFrequently Asked Questions
What is QUIKTRIP #4014?
QUIKTRIP #4014 is a new construction project at 9110 TARPON DR in Boerne, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: QT is proposing to construct a 4,840 SF C-store with retail gasoline sales.
Is QUIKTRIP #4014 open in Boerne?
Construction on QUIKTRIP #4014 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2019. The building is finished and very likely open.
Where is QUIKTRIP #4014 located?
QUIKTRIP #4014 is located at 9110 TARPON DR, Boerne, TX, 78006, in Bexar County.
Who is the owner or developer of QUIKTRIP #4014?
QT SOUTH LLC is the property owner/developer of record for QUIKTRIP #4014, per its TDLR project registration.
Who is the architect or design firm for QUIKTRIP #4014?
DANIEL D. FILUK is the design firm of record for QUIKTRIP #4014, according to its TDLR filing.
How much does QUIKTRIP #4014 cost and how big is it?
QUIKTRIP #4014 has an estimated construction value of $375K and approximately 1 square feet (about $375.00K/sqft), based on its TDLR filing.
๐Scope of Work
QT is proposing to construct a 4,840 SF C-store with retail gasoline sales.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 14, 2018
Review Complete
Inspection Complete
Closed
Jun 1, 2019
๐Related Projects
๐คSame Owner
$61.8M total๐๏ธSame Design Firm
$3.9M totalProperty Owner
Design Firm
Bexar County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bexar County
Find General Contractors in Bexar