CFH INVESTMENTS
CFH INVESTMENTS is a renovation/alteration project at 3101 BEE CAVES, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2018). The project has an estimated value of $85K.
๐Project Metrics
TDLR #EABPRJB8823786Inspection Complete
Final inspection completed, awaiting project closure
CFH INVESTMENTS is a Renovation/Alteration project located at 3101 BEE CAVES, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $85K. RANCHO PARTNERS AUSTIN LP is the property owner and INTERSTRUCT ARCHITECTURAL SERVICES is the design firm of record. The project was registered with TDLR on August 14, 2018.
โFrequently Asked Questions
What is CFH INVESTMENTS?
CFH INVESTMENTS is a renovation/alteration project at 3101 BEE CAVES in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing office space.
Is CFH INVESTMENTS open in Austin?
Construction on CFH INVESTMENTS is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2018. The building is finished and very likely open.
Where is CFH INVESTMENTS located?
CFH INVESTMENTS is located at 3101 BEE CAVES, Austin, TX, 78746, in Travis County.
Who is the owner or developer of CFH INVESTMENTS?
RANCHO PARTNERS AUSTIN LP is the property owner/developer of record for CFH INVESTMENTS, per its TDLR project registration.
Who is the architect or design firm for CFH INVESTMENTS?
INTERSTRUCT ARCHITECTURAL SERVICES is the design firm of record for CFH INVESTMENTS, according to its TDLR filing.
How much does CFH INVESTMENTS cost and how big is it?
CFH INVESTMENTS has an estimated construction value of $85K, based on its TDLR filing.
๐Scope of Work
Interior remodel of existing office space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 14, 2018
Review Complete
Inspection Complete
Oct 1, 2018
Closed
๐Related Projects
๐คSame Owner
$1.0M total๐๏ธSame Design Firm
$235K total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1320
gas pipe addition/replacement: We are redoing portion of gas line that was black iron and in ground and redoing it with black iron with the same sizing and placing it 3 inches above grade.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1213
GAF TPO roof replacement system fully tapered insulation system.
7 DAY - Tenant finish out of existing space - OVA