Project intelligenceTDLR EABPRJB8823799New Construction
Funding type

This project is privately funded, on private land for private use.

THE EDGE OFFICE CAMPUS - D

137 STATE HIGHWAY 121, Coppell, TX, 75019

Target date passed (Mar 2020)Review Complete

THE EDGE OFFICE CAMPUS - D is a new construction project at 137 STATE HIGHWAY 121, Coppell, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.5M.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 14, 2018565 days across supplied datesMar 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    547 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75019 (Coppell)

One email per change. Unsubscribe in one click. Privacy.

THE EDGE OFFICE CAMPUS - D is a New Construction project located at 137 STATE HIGHWAY 121, Coppell, TX 75019 in Coppell, Texas. The project has an estimated value of $1.5M. SAVANNAH COPPELL DEVELOPMENT LLC is the property owner and O'BRIEN & ASSOCIATES INC. is the design firm of record. The project was registered with TDLR on August 14, 2018.

Frequently Asked Questions

What is THE EDGE OFFICE CAMPUS - D?

THE EDGE OFFICE CAMPUS - D is a new construction project at 137 STATE HIGHWAY 121 in Coppell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site improvements (parking, pavement, sidewalks, landscape); single-story office/medical office building - steel

Is THE EDGE OFFICE CAMPUS - D open in Coppell?

THE EDGE OFFICE CAMPUS - D was scheduled to finish construction in Mar 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is THE EDGE OFFICE CAMPUS - D located?

THE EDGE OFFICE CAMPUS - D is located at 137 STATE HIGHWAY 121, Coppell, TX, 75019, in Dallas County.

Who is the owner or developer of THE EDGE OFFICE CAMPUS - D?

SAVANNAH COPPELL DEVELOPMENT LLC is the property owner/developer of record for THE EDGE OFFICE CAMPUS - D, per its TDLR project registration.

Who is the architect or design firm for THE EDGE OFFICE CAMPUS - D?

O'BRIEN & ASSOCIATES INC. is the design firm of record for THE EDGE OFFICE CAMPUS - D, according to its TDLR filing.

How much does THE EDGE OFFICE CAMPUS - D cost and how big is it?

THE EDGE OFFICE CAMPUS - D has an estimated construction value of $1.5M, based on its TDLR filing.

Scope of Work

Site improvements (parking, pavement, sidewalks, landscape); single-story office/medical office building - steel

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

137 STATE HIGHWAY 121, Coppell, TX, 75019

Location by street address

Watch all construction in 75019 (Coppell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.