Project intelligenceTDLR EABPRJB8824022New Construction
Funding type

This project is privately funded, on private land for private use.

GECU OPS II

1225 AIRWAY BLVD. BUILDING B, El Paso, TX, 79925

Construction complete · Apr 2019Inspection Complete

GECU OPS II is a new construction project at 1225 AIRWAY BLVD. BUILDING B, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2019). The project has an estimated value of $10.0M.

Estimated project value
$10.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 17, 2018227 days across supplied datesApr 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79925 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

GECU OPS II is a New Construction project located at 1225 AIRWAY BLVD. BUILDING B, El Paso, TX 79925 in El Paso, Texas. The project has an estimated value of $10.0M. GECU is the property owner and ROBERT BROWN ARCHITECTS is the design firm of record. The project was registered with TDLR on August 17, 2018.

Frequently Asked Questions

What is GECU OPS II?

GECU OPS II is a new construction project at 1225 AIRWAY BLVD. BUILDING B in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 40,794 s.f. Operations and IT center for GECU with site improvements, story tower plus lower level.

Is GECU OPS II open in El Paso?

Construction on GECU OPS II is complete — TDLR records show the project passed its required accessibility inspection in Apr 2019. The building is finished and very likely open.

Where is GECU OPS II located?

GECU OPS II is located at 1225 AIRWAY BLVD. BUILDING B, El Paso, TX, 79925, in El Paso County.

Who is the owner or developer of GECU OPS II?

GECU is the property owner/developer of record for GECU OPS II, per its TDLR project registration.

Who is the architect or design firm for GECU OPS II?

ROBERT BROWN ARCHITECTS is the design firm of record for GECU OPS II, according to its TDLR filing.

How much does GECU OPS II cost and how big is it?

GECU OPS II has an estimated construction value of $10.0M, based on its TDLR filing.

Scope of Work

New 40,794 s.f. Operations and IT center for GECU with site improvements, story tower plus lower level.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1225 AIRWAY BLVD. BUILDING B, El Paso, TX, 79925

Location by street address

Watch all construction in 79925 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.