MURPHY OIL USA, INC.
MURPHY OIL USA, INC. is a new construction project at 8515 IMPERIAL DRIVE, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $1.5M across about 1,200 sq ft.
๐Project Metrics
TDLR #EABPRJB8824639Project Closed
Project has been completed and closed
MURPHY OIL USA, INC. is a New Construction project located at 8515 IMPERIAL DRIVE, Waco, TX 76712 in Waco, Texas. The project has an estimated value of $1.5M covering 1,200 sq ft. MURPHY OIL USA INC. is the property owner and JM CIVIL ENGINEERING is the design firm of record. The project was registered with TDLR on August 24, 2018.
โFrequently Asked Questions
What is MURPHY OIL USA, INC.?
MURPHY OIL USA, INC. is a new construction project at 8515 IMPERIAL DRIVE in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition and removal of existing fueling station building, canopy, USTs, pavement and associated utilities. Co
Is MURPHY OIL USA, INC. open in Waco?
Construction on MURPHY OIL USA, INC. is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is MURPHY OIL USA, INC. located?
MURPHY OIL USA, INC. is located at 8515 IMPERIAL DRIVE, Waco, TX, 76712, in McLennan County.
Who is the owner or developer of MURPHY OIL USA, INC.?
MURPHY OIL USA INC. is the property owner/developer of record for MURPHY OIL USA, INC., per its TDLR project registration.
Who is the architect or design firm for MURPHY OIL USA, INC.?
JM CIVIL ENGINEERING is the design firm of record for MURPHY OIL USA, INC., according to its TDLR filing.
How much does MURPHY OIL USA, INC. cost and how big is it?
MURPHY OIL USA, INC. has an estimated construction value of $1.5M and approximately 1,200 square feet (about $1.25K/sqft), based on its TDLR filing.
๐Scope of Work
Demolition and removal of existing fueling station building, canopy, USTs, pavement and associated utilities. Co
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 24, 2018
Review Complete
Inspection Complete
Closed
Aug 17, 2019
๐Related Projects
๐คSame Owner
$168.4M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Registered Accessibility Specialist
McLennan County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in McLennan County
Find General Contractors in McLennan