Project intelligenceTDLR EABPRJB8824806New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CLEAR LAKE CITY WATER AUTHORITY in Houston, TX

17507 EL CAMINO REAL, Houston, TX, 77058

Construction complete · Dec 2019Project Closed

CLEAR LAKE CITY WATER AUTHORITY is a new construction project at 17507 EL CAMINO REAL, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $1.4M.

Estimated project value
$1.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 29, 2018459 days across supplied datesDec 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    94 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77058 (Houston)

One email per change. Unsubscribe in one click. Privacy.

CLEAR LAKE CITY WATER AUTHORITY is a New Construction project located at 17507 EL CAMINO REAL, Houston, TX 77058 in Houston, Texas. The project has an estimated value of $1.4M. CLEAR LAKE CITY WATER AUTHORITY is the property owner and DIAMOND DEVELOPMENT GROUP is the design firm of record. The project was registered with TDLR on August 29, 2018.

Frequently Asked Questions

What is CLEAR LAKE CITY WATER AUTHORITY?

CLEAR LAKE CITY WATER AUTHORITY is a new construction project at 17507 EL CAMINO REAL in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consist of a 3 story masonry building for officeand shop use with separate single story equipment shed.

Is CLEAR LAKE CITY WATER AUTHORITY open in Houston?

Construction on CLEAR LAKE CITY WATER AUTHORITY is complete — TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.

Where is CLEAR LAKE CITY WATER AUTHORITY located?

CLEAR LAKE CITY WATER AUTHORITY is located at 17507 EL CAMINO REAL, Houston, TX, 77058, in Harris County.

Who is the owner or developer of CLEAR LAKE CITY WATER AUTHORITY?

CLEAR LAKE CITY WATER AUTHORITY is the property owner/developer of record for CLEAR LAKE CITY WATER AUTHORITY, per its TDLR project registration.

Who is the architect or design firm for CLEAR LAKE CITY WATER AUTHORITY?

DIAMOND DEVELOPMENT GROUP is the design firm of record for CLEAR LAKE CITY WATER AUTHORITY, according to its TDLR filing.

How much does CLEAR LAKE CITY WATER AUTHORITY cost and how big is it?

CLEAR LAKE CITY WATER AUTHORITY has an estimated construction value of $1.4M, based on its TDLR filing.

Scope of Work

Project consist of a 3 story masonry building for officeand shop use with separate single story equipment shed.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

17507 EL CAMINO REAL, Houston, TX, 77058

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77058 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.