7-ELEVEN R&D
7-ELEVEN R&D is a renovation/alteration project at 4795 REGENT BLVD., Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $3.5M.
๐Project Metrics
TDLR #EABPRJB9800752Project Closed
Project has been completed and closed
7-ELEVEN R&D is a Renovation/Alteration project located at 4795 REGENT BLVD., Irving, TX 75063 in Irving, Texas. The project has an estimated value of $3.5M. IRVING is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on September 12, 2018.
โFrequently Asked Questions
What is 7-ELEVEN R&D?
7-ELEVEN R&D is a renovation/alteration project at 4795 REGENT BLVD. in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 40,000 SF NEW INTERIOR FINISH OUT OF EXISTING FIRST GENERATION OFFICE SPACE,SPRINKLERED.
Is 7-ELEVEN R&D open in Irving?
Construction on 7-ELEVEN R&D is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.
Where is 7-ELEVEN R&D located?
7-ELEVEN R&D is located at 4795 REGENT BLVD., Irving, TX, 75063, in Dallas County.
Who is the owner or developer of 7-ELEVEN R&D?
IRVING is the property owner/developer of record for 7-ELEVEN R&D, per its TDLR project registration.
Who is the architect or design firm for 7-ELEVEN R&D?
GENSLER is the design firm of record for 7-ELEVEN R&D, according to its TDLR filing.
How much does 7-ELEVEN R&D cost and how big is it?
7-ELEVEN R&D has an estimated construction value of $3.5M, based on its TDLR filing.
๐Scope of Work
A 40,000 SF NEW INTERIOR FINISH OUT OF EXISTING FIRST GENERATION OFFICE SPACE,SPRINKLERED.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 12, 2018
Review Complete
Inspection Complete
Closed
Dec 1, 2018