NE2.416A PET CT - LEVEL 02 is a renovation/alteration project at 5323 HARRY HINES BLVD., Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2019). The project has an estimated value of $400K.
Project has been completed and closed
NE2.416A PET CT - LEVEL 02 is a Renovation/Alteration project located at 5323 HARRY HINES BLVD., Dallas, TX 75390 in Dallas, Texas. The project has an estimated value of $400K. UT SOUTHWESTERN MEDICAL CENTER AT DALLAS is the property owner and SM ARCHITECTS PLLC is the design firm of record. The project was registered with TDLR on September 12, 2018.
NE2.416A PET CT - LEVEL 02 is a renovation/alteration project at 5323 HARRY HINES BLVD. in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Located on 2nd floor of an existing Pet CT suite. Replace Pet CT scanner and flooring in room 416A. Provide addi
Construction on NE2.416A PET CT - LEVEL 02 is complete โ TDLR records show the project passed its required accessibility inspection in May 2019. The building is finished and very likely open.
NE2.416A PET CT - LEVEL 02 is located at 5323 HARRY HINES BLVD., Dallas, TX, 75390, in Dallas County.
UT SOUTHWESTERN MEDICAL CENTER AT DALLAS is the property owner/developer of record for NE2.416A PET CT - LEVEL 02, per its TDLR project registration.
SM ARCHITECTS PLLC is the design firm of record for NE2.416A PET CT - LEVEL 02, according to its TDLR filing.
NE2.416A PET CT - LEVEL 02 has an estimated construction value of $400K, based on its TDLR filing.
Located on 2nd floor of an existing Pet CT suite. Replace Pet CT scanner and flooring in room 416A. Provide addi
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 12, 2018
Review Complete
Inspection Complete
Closed
May 1, 2019