AN4 1B STARLINE
AN4 1B STARLINE is a renovation/alteration project at 1300 S MOPAC EXPY, AUSTIN, TX, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $375K.
๐Project Metrics
TDLR #EABPRJB9800881Review Complete
Design review complete, construction may proceed
AN4 1B STARLINE is a Renovation/Alteration project located at 1300 S MOPAC EXPY, AUSTIN, TX, Austin, TX 78746 in Austin, Texas. The project has an estimated value of $375K. INTEL CORPORATION is the property owner and PAGE SOUTHERLAND PAGE INC. is the design firm of record. The project was registered with TDLR on September 14, 2018.
โFrequently Asked Questions
What is AN4 1B STARLINE?
AN4 1B STARLINE is a renovation/alteration project at 1300 S MOPAC EXPY, AUSTIN, TX in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Utility revisions in existing electrical testing lab.
Is AN4 1B STARLINE open in Austin?
AN4 1B STARLINE is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is AN4 1B STARLINE located?
AN4 1B STARLINE is located at 1300 S MOPAC EXPY, AUSTIN, TX, Austin, TX, 78746, in Travis County.
Who is the owner or developer of AN4 1B STARLINE?
INTEL CORPORATION is the property owner/developer of record for AN4 1B STARLINE, per its TDLR project registration.
Who is the architect or design firm for AN4 1B STARLINE?
PAGE SOUTHERLAND PAGE INC. is the design firm of record for AN4 1B STARLINE, according to its TDLR filing.
How much does AN4 1B STARLINE cost and how big is it?
AN4 1B STARLINE has an estimated construction value of $375K, based on its TDLR filing.
๐Scope of Work
Utility revisions in existing electrical testing lab.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 14, 2018
Review Complete
Sep 14, 2018
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$5.4M total๐Related City Permits
Building permits found at or near this location
Install Level 2 EV Charger
Replacing galvanized and copper water pipe front yard and underneath home.
Tunnel under the foundation to replace the cast iron drain lines in the bathroom Kitchen and laundry with SCH 40 PVC. There will be three access holds: one in front one on the side and one behind the house.
Main elctrica panel upgrade.
Unit 31 building 3. New two story condominium townhome residence covered porch 2 bedroom 2.5 bathroom.