FM 97
US 70 TO SH 207, Lockney, TX, 79241
FM 97 is a new construction project at US 70 TO SH 207, Lockney, in Floyd County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2020). The project has an estimated value of $8.9M.
- Estimated project value
- $8.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- Not supplied
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- —
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
202 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
743 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79241 (Lockney)
One email per change. Unsubscribe in one click. Privacy.
FM 97 is a New Construction project located at US 70 TO SH 207, Lockney, TX 79241 in Lockney, Texas. The project has an estimated value of $8.9M. TXDOT DISTRICT: LUBBOCK is the property owner. The project was registered with TDLR on September 19, 2018.
Frequently Asked Questions
What is FM 97?
FM 97 is a new construction project at US 70 TO SH 207 in Lockney, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehab, sidewalk, ramps, driveways, signing, striping
Is FM 97 open in Lockney?
Construction on FM 97 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2020. The building is finished and very likely open.
Where is FM 97 located?
FM 97 is located at US 70 TO SH 207, Lockney, TX, 79241, in Floyd County.
Who is the owner or developer of FM 97?
TXDOT DISTRICT: LUBBOCK is the property owner/developer of record for FM 97, per its TDLR project registration.
How much does FM 97 cost and how big is it?
FM 97 has an estimated construction value of $8.9M, based on its TDLR filing.
Scope of Work
Rehab, sidewalk, ramps, driveways, signing, striping
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
US 70 TO SH 207, Lockney, TX, 79241
Related Projects
Same Owner
$37.03B totalWatch all construction in 79241 (Lockney)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lockney?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.