CPA GLOBAL
CPA GLOBAL is a renovation/alteration project at 7800 SHOAL CREEK BLVD Suite 220 - W, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2019). The project has an estimated value of $285K.
๐Project Metrics
TDLR #EABPRJB9801262Project Closed
Project has been completed and closed
CPA GLOBAL is a Renovation/Alteration project located at 7800 SHOAL CREEK BLVD Suite 220 - W, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $285K. CUSHMAN WAKEFIELD is the property owner and S. TIPTON STUDIO is the design firm of record. The project was registered with TDLR on September 19, 2018.
โFrequently Asked Questions
What is CPA GLOBAL?
CPA GLOBAL is a renovation/alteration project at 7800 SHOAL CREEK BLVD Suite 220 - W in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing space.
Is CPA GLOBAL open in Austin?
Construction on CPA GLOBAL is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2019. The building is finished and very likely open.
Where is CPA GLOBAL located?
CPA GLOBAL is located at 7800 SHOAL CREEK BLVD Suite 220 - W, Austin, TX, 78758, in Travis County.
Who is the owner or developer of CPA GLOBAL?
CUSHMAN WAKEFIELD is the property owner/developer of record for CPA GLOBAL, per its TDLR project registration.
Who is the architect or design firm for CPA GLOBAL?
S. TIPTON STUDIO is the design firm of record for CPA GLOBAL, according to its TDLR filing.
How much does CPA GLOBAL cost and how big is it?
CPA GLOBAL has an estimated construction value of $285K, based on its TDLR filing.
๐Scope of Work
Renovation of an existing space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 19, 2018
Review Complete
Inspection Complete
Closed
Jan 25, 2019
๐Related Projects
๐คSame Owner
$820K total๐๏ธSame Design Firm
$164.9M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Two Stage Horizontal Gas System (#1410)
Replacement of complete existing central heat and air system with or without duct work 1 system: a 3 ton 14 seer2 single stage condenser gas furnace and evap coil
*Partial Demo* Interior remodel/partial garage conversion two-story SFR
*Partial Demo* Interior remodel/partial garage conversion two-story SFR
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2 Ton AC System