Project intelligenceTDLR EABPRJB9801884New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CONTROL BUILDING

20015 HARDY OAK BLVD, San Antonio, TX, 78258

Construction complete · Jun 2020Project Closed

CONTROL BUILDING is a new construction project at 20015 HARDY OAK BLVD, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2020). The project has an estimated value of $550K.

Estimated project value
$550K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 1, 2018609 days across supplied datesJun 1, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    609 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78258 (San Antonio)

One email per change. Unsubscribe in one click. Privacy.

CONTROL BUILDING is a New Construction project located at 20015 HARDY OAK BLVD, San Antonio, TX 78258 in San Antonio, Texas. The project has an estimated value of $550K. SAN ANTONIO WATER SYSTEM is the property owner and LOPEZ SALAS ARCHITECTS is the design firm of record. The project was registered with TDLR on October 1, 2018.

Frequently Asked Questions

What is CONTROL BUILDING?

CONTROL BUILDING is a new construction project at 20015 HARDY OAK BLVD in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new Control Building for the San Antonio Water System Water Treatment Facility as part of the

Is CONTROL BUILDING open in San Antonio?

Construction on CONTROL BUILDING is complete — TDLR records show the project passed its required accessibility inspection in Jun 2020. The building is finished and very likely open.

Where is CONTROL BUILDING located?

CONTROL BUILDING is located at 20015 HARDY OAK BLVD, San Antonio, TX, 78258, in Bexar County.

Who is the owner or developer of CONTROL BUILDING?

SAN ANTONIO WATER SYSTEM is the property owner/developer of record for CONTROL BUILDING, per its TDLR project registration.

Who is the architect or design firm for CONTROL BUILDING?

LOPEZ SALAS ARCHITECTS is the design firm of record for CONTROL BUILDING, according to its TDLR filing.

How much does CONTROL BUILDING cost and how big is it?

CONTROL BUILDING has an estimated construction value of $550K, based on its TDLR filing.

Scope of Work

Construction of a new Control Building for the San Antonio Water System Water Treatment Facility as part of the

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20015 HARDY OAK BLVD, San Antonio, TX, 78258

Location by street address

Related City Permits

Building permits found at or near this location

20015 HARDY OAK BLVD, City of San Antonio, TX 78258

634900

IssuedElectrical General PermitDec 2025
SAT-MEP-ELE-PMT25-33334900

Watch all construction in 78258 (San Antonio)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Antonio?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.