ODHS: LEVEL 1 FINISH OUT in Dallas, TX

2218 BRYAN STREET, Dallas, TX, 75201

Construction complete · Dec 2018Project Closed

ODHS: LEVEL 1 FINISH OUT is a renovation/alteration project at 2218 BRYAN STREET, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2018). The project has an estimated value of $500K.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 9, 201853 days across supplied datesDec 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    23 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75201 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

ODHS: LEVEL 1 FINISH OUT is a Renovation/Alteration project located at 2218 BRYAN STREET, Dallas, TX 75201 in Dallas, Texas. The project has an estimated value of $500K. MATTHEWS SOUTHWEST is the property owner and PERKINS + WILL is the design firm of record. The project was registered with TDLR on October 9, 2018.

Frequently Asked Questions

What is ODHS: LEVEL 1 FINISH OUT?

ODHS: LEVEL 1 FINISH OUT is a renovation/alteration project at 2218 BRYAN STREET in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finish out of historical building shell space on level 1.

Is ODHS: LEVEL 1 FINISH OUT open in Dallas?

Construction on ODHS: LEVEL 1 FINISH OUT is complete — TDLR records show the project passed its required accessibility inspection in Dec 2018. The building is finished and very likely open.

Where is ODHS: LEVEL 1 FINISH OUT located?

ODHS: LEVEL 1 FINISH OUT is located at 2218 BRYAN STREET, Dallas, TX, 75201, in Dallas County.

Who is the owner or developer of ODHS: LEVEL 1 FINISH OUT?

MATTHEWS SOUTHWEST is the property owner/developer of record for ODHS: LEVEL 1 FINISH OUT, per its TDLR project registration.

Who is the architect or design firm for ODHS: LEVEL 1 FINISH OUT?

PERKINS + WILL is the design firm of record for ODHS: LEVEL 1 FINISH OUT, according to its TDLR filing.

How much does ODHS: LEVEL 1 FINISH OUT cost and how big is it?

ODHS: LEVEL 1 FINISH OUT has an estimated construction value of $500K, based on its TDLR filing.

Scope of Work

Interior Finish out of historical building shell space on level 1.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2218 BRYAN STREET, Dallas, TX, 75201

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75201 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.