Project intelligenceTDLR EABPRJB9803211New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RAILROAD BUFFER PHASE 1 in Arlington, TX

GPS 32.813644, -97.077062, Arlington, TX, 76040

Construction complete · Mar 2019Inspection Complete

RAILROAD BUFFER PHASE 1 is a new construction project at GPS 32.813644, -97.077062, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2019). The project has an estimated value of $370K.

Estimated project value
$370K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 18, 2018134 days across supplied datesMar 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    120 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76040 (Arlington)

One email per change. Unsubscribe in one click. Privacy.

RAILROAD BUFFER PHASE 1 is a New Construction project located at GPS 32.813644, -97.077062, Arlington, TX 76040 in Arlington, Texas. The project has an estimated value of $370K. VIRIDIAN MUNICIPAL MANAGEMENT DISTRICT is the property owner and SMITHGROUP is the design firm of record. The project was registered with TDLR on October 18, 2018.

Frequently Asked Questions

What is RAILROAD BUFFER PHASE 1?

RAILROAD BUFFER PHASE 1 is a new construction project at GPS 32.813644, -97.077062 in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project includes concrete trails, site furnishings, storm sewers, irrigation, and landscaping.

Is RAILROAD BUFFER PHASE 1 open in Arlington?

Construction on RAILROAD BUFFER PHASE 1 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2019. The building is finished and very likely open.

Where is RAILROAD BUFFER PHASE 1 located?

RAILROAD BUFFER PHASE 1 is located at GPS 32.813644, -97.077062, Arlington, TX, 76040, in Tarrant County.

Who is the owner or developer of RAILROAD BUFFER PHASE 1?

VIRIDIAN MUNICIPAL MANAGEMENT DISTRICT is the property owner/developer of record for RAILROAD BUFFER PHASE 1, per its TDLR project registration.

Who is the architect or design firm for RAILROAD BUFFER PHASE 1?

SMITHGROUP is the design firm of record for RAILROAD BUFFER PHASE 1, according to its TDLR filing.

How much does RAILROAD BUFFER PHASE 1 cost and how big is it?

RAILROAD BUFFER PHASE 1 has an estimated construction value of $370K, based on its TDLR filing.

Scope of Work

Project includes concrete trails, site furnishings, storm sewers, irrigation, and landscaping.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

GPS 32.813644, -97.077062, Arlington, TX, 76040

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76040 (Arlington)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Arlington?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.