Project intelligenceTDLR EABPRJB9803286New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FLOWER MOUND FIRE STATION 7

2777 SKILLERN BLVD., Flower Mound, TX, 75028

Construction complete · Dec 2019Project Closed

FLOWER MOUND FIRE STATION 7 is a new construction project at 2777 SKILLERN BLVD., Flower Mound, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $4.4M.

Estimated project value
$4.4M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 18, 2018409 days across supplied datesDec 1, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    44 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    365 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75028 (Flower Mound)

One email per change. Unsubscribe in one click. Privacy.

FLOWER MOUND FIRE STATION 7 is a New Construction project located at 2777 SKILLERN BLVD., Flower Mound, TX 75028 in Flower Mound, Texas. The project has an estimated value of $4.4M. TOWN OF FLOWER MOUND is the property owner and BROWN REYNOLDS WATFORD ARCHITECTS is the design firm of record. The project was registered with TDLR on October 18, 2018.

Frequently Asked Questions

What is FLOWER MOUND FIRE STATION 7?

FLOWER MOUND FIRE STATION 7 is a new construction project at 2777 SKILLERN BLVD. in Flower Mound, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New fire station approximately 9,797 SF, with new parking, site work & irrigation.

Is FLOWER MOUND FIRE STATION 7 open in Flower Mound?

Construction on FLOWER MOUND FIRE STATION 7 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.

Where is FLOWER MOUND FIRE STATION 7 located?

FLOWER MOUND FIRE STATION 7 is located at 2777 SKILLERN BLVD., Flower Mound, TX, 75028, in Denton County.

Who is the owner or developer of FLOWER MOUND FIRE STATION 7?

TOWN OF FLOWER MOUND is the property owner/developer of record for FLOWER MOUND FIRE STATION 7, per its TDLR project registration.

Who is the architect or design firm for FLOWER MOUND FIRE STATION 7?

BROWN REYNOLDS WATFORD ARCHITECTS is the design firm of record for FLOWER MOUND FIRE STATION 7, according to its TDLR filing.

How much does FLOWER MOUND FIRE STATION 7 cost and how big is it?

FLOWER MOUND FIRE STATION 7 has an estimated construction value of $4.4M, based on its TDLR filing.

Scope of Work

New fire station approximately 9,797 SF, with new parking, site work & irrigation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2777 SKILLERN BLVD., Flower Mound, TX, 75028

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75028 (Flower Mound)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Flower Mound?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.