Project has been completed and closed
PHASE 1 - LAKE FRONT TRAIL IMPROVEMENTS is a New Construction project located at 2401 HOLLY STREET, Austin, TX 78702 in Austin, Texas. The project has an estimated value of $1.3M covering 12,000 sq ft. CITY OF AUSTIN is the property owner and MWM DESIGNGROUP is the design firm of record. The project was registered with TDLR on October 22, 2018.
Approximately 3000 lf of sidewalk/trail improvements, modification of existing intake for new sidewalk.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 22, 2018
Review Complete
Inspection Complete
Closed
Oct 1, 2021
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work PEDERNALES CONDOMINIUM
Addition of a Manual Transfer Switch to the building after the main service disconnect to provide capabilities to connect a TEMPORARY towable generator when needed during outages. The Manual Transfer Switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other.
Replacement of complete existing central heat and air system with or without duct work EXACT REPLACEMENT OF AC 2 TON WITH 5KW HEATER LIKE FOR LIKE
Express: Foundation repair
New irrigation system for Goodnight Ranch Park and Ride
City of Austin site plan approvals at this location
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis