Design review complete, construction may proceed
NORTHVIEW FINISH OUT is a Renovation/Alteration project located at 9011 N. 35 IH., Austin, TX 78753 in Austin, Texas. The project has an estimated value of $750K covering 9,820 sq ft. NORTHVIEW OWNER LLC is the property owner and MWM DESIGNGROUP is the design firm of record. The project was registered with TDLR on May 31, 2023.
NORTHVIEW FINISH OUT is a renovation/alteration project at 9011 N. 35 IH., Austin, TX 78753 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The scope includes limited demolition of interior partitions, limited relocation of existing component, and limited construction of new partitions in interior spaces.
NORTHVIEW FINISH OUT is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
NORTHVIEW FINISH OUT is located at 9011 N. 35 IH., Austin, TX 78753, Austin, TX, 78753, in Travis County.
NORTHVIEW OWNER LLC is the property owner/developer of record for NORTHVIEW FINISH OUT, per its TDLR project registration.
MWM DESIGNGROUP is the design firm of record for NORTHVIEW FINISH OUT, according to its TDLR filing.
NORTHVIEW FINISH OUT has an estimated construction value of $750K and approximately 9,820 square feet (about $76/sqft), based on its TDLR filing.
The scope includes limited demolition of interior partitions, limited relocation of existing component, and limited construction of new partitions in interior spaces.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 31, 2023
Review Complete
May 31, 2023
Inspection Complete
Closed
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Express: Remove and replace 6 windows (like for like)
Irrigation install
Repair to sewer line under the house via tunnel
Request to Disconnect and Reconnect. upgrading 100 amp FPE panel to a 200 amp and new meter