ELECTRONINKS
ELECTRONINKS is a renovation/alteration project at 7901 RIVERSIDE DRIVE Building 1 Suite 150, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $781K.
๐Project Metrics
TDLR #EABPRJB9804004Review Complete
Design review complete, construction may proceed
ELECTRONINKS is a Renovation/Alteration project located at 7901 RIVERSIDE DRIVE Building 1 Suite 150, Austin, TX 78744 in Austin, Texas. The project has an estimated value of $781K. TRANSWESTERN COMMERCIAL SERVICES is the property owner and LINK ARCHITECTURE is the design firm of record. The project was registered with TDLR on October 29, 2018.
โFrequently Asked Questions
What is ELECTRONINKS?
ELECTRONINKS is a renovation/alteration project at 7901 RIVERSIDE DRIVE Building 1 Suite 150 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel of existing office/warehouse space. NewLab space for ink development
Is ELECTRONINKS open in Austin?
ELECTRONINKS is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is ELECTRONINKS located?
ELECTRONINKS is located at 7901 RIVERSIDE DRIVE Building 1 Suite 150, Austin, TX, 78744, in Travis County.
Who is the owner or developer of ELECTRONINKS?
TRANSWESTERN COMMERCIAL SERVICES is the property owner/developer of record for ELECTRONINKS, per its TDLR project registration.
Who is the architect or design firm for ELECTRONINKS?
LINK ARCHITECTURE is the design firm of record for ELECTRONINKS, according to its TDLR filing.
How much does ELECTRONINKS cost and how big is it?
ELECTRONINKS has an estimated construction value of $781K, based on its TDLR filing.
๐Scope of Work
Interior Remodel of existing office/warehouse space. NewLab space for ink development
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 29, 2018
Review Complete
Oct 29, 2018
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$12.9M total๐๏ธSame Design Firm
$2.2M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
replacing a 1000 gallon grease interceptor with a 1500 gallon grease interceptor. I will attached the IW approval letter to.
Replacement of furnace only Install replacement of 3 ton evaporator coil and furnace & replacing supply Plenum
new irrigation system
INSTALL NEW 200 AMP METER RACK