BOTTLED BLONDE
BOTTLED BLONDE is a renovation/alteration project at 4901WASHINGTON AVE, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2019). The project has an estimated value of $250K.
๐Project Metrics
TDLR #EABPRJB9804733Project Closed
Project has been completed and closed
BOTTLED BLONDE is a Renovation/Alteration project located at 4901WASHINGTON AVE, Houston, TX 77007 in Houston, Texas. The project has an estimated value of $250K. WASHINGTON REALTY CORP is the property owner and CISNEROS DESIGN STUDIO ARCHITECTS LLC is the design firm of record. The project was registered with TDLR on November 7, 2018.
โFrequently Asked Questions
What is BOTTLED BLONDE?
BOTTLED BLONDE is a renovation/alteration project at 4901WASHINGTON AVE in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Lease space build-out and rooftop terrace.
Is BOTTLED BLONDE open in Houston?
Construction on BOTTLED BLONDE is complete โ TDLR records show the project passed its required accessibility inspection in May 2019. The building is finished and very likely open.
Where is BOTTLED BLONDE located?
BOTTLED BLONDE is located at 4901WASHINGTON AVE, Houston, TX, 77007, in Harris County.
Who is the owner or developer of BOTTLED BLONDE?
WASHINGTON REALTY CORP is the property owner/developer of record for BOTTLED BLONDE, per its TDLR project registration.
Who is the architect or design firm for BOTTLED BLONDE?
CISNEROS DESIGN STUDIO ARCHITECTS LLC is the design firm of record for BOTTLED BLONDE, according to its TDLR filing.
How much does BOTTLED BLONDE cost and how big is it?
BOTTLED BLONDE has an estimated construction value of $250K, based on its TDLR filing.
๐Scope of Work
Lease space build-out and rooftop terrace.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 7, 2018
Review Complete
Inspection Complete
Closed
May 1, 2019