Project has been completed and closed
VIZCAYA PHASE 4C MODEL HOME PARKING LOTS is a New Construction project located at 2400 & 2401 RISANA COVE, Round Rock, TX 78665 in Round Rock, Texas. The project has an estimated value of $50K. TAYLOR MORRISON OF TEXAS INC is the property owner and PAPE-DAWSON ENGINEERS INC is the design firm of record. The project was registered with TDLR on November 8, 2018.
Construction of 4' and 5' sidewalk for model home parking lots
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 8, 2018
Review Complete
Inspection Complete
Closed
Apr 1, 2019
Building permits found at or near this location
Commercial rooftop Solar installation 770.18 kw DC.
Express: Foundation repair
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Update 6/1/26 LS- 2 phase project. Both bathrooms are being remodel. GC will complete primary bathroom and then call in inspections for second guest bathroom. Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Need a contractor for this project?
Browse verified general contractors active in Williamson County
Find General Contractors in Williamson