FROST GUADALUPE
FROST GUADALUPE is a renovation/alteration project at 231 N. GUADALUPE ST, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2019). The project has an estimated value of $400K.
๐Project Metrics
TDLR #EABPRJB9805444Project Closed
Project has been completed and closed
FROST GUADALUPE is a Renovation/Alteration project located at 231 N. GUADALUPE ST, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $400K. SCOTT TRAINER is the property owner and MCKINNEY YORK ARCHITECTS is the design firm of record. The project was registered with TDLR on November 16, 2018.
โFrequently Asked Questions
What is FROST GUADALUPE?
FROST GUADALUPE is a renovation/alteration project at 231 N. GUADALUPE ST in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant Finish-Out
Is FROST GUADALUPE open in San Marcos?
Construction on FROST GUADALUPE is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2019. The building is finished and very likely open.
Where is FROST GUADALUPE located?
FROST GUADALUPE is located at 231 N. GUADALUPE ST, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of FROST GUADALUPE?
SCOTT TRAINER is the property owner/developer of record for FROST GUADALUPE, per its TDLR project registration.
Who is the architect or design firm for FROST GUADALUPE?
MCKINNEY YORK ARCHITECTS is the design firm of record for FROST GUADALUPE, according to its TDLR filing.
How much does FROST GUADALUPE cost and how big is it?
FROST GUADALUPE has an estimated construction value of $400K, based on its TDLR filing.
๐Scope of Work
Tenant Finish-Out
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 16, 2018
Review Complete
Inspection Complete
Closed
Mar 1, 2019
๐Related Projects
๐คSame Owner
$1.6M total๐๏ธSame Design Firm
$624.0M total๐Related City Permits
Building permits found at or near this location
EMERGENCY REPAIR REPLACE (DAMAGE ) SPECTRUM POWER SUPPLY BOX
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - Addition/Remodel to Existing Single Family Res. addition of mudroom addition of second floor kitchen remodel/relocation adding 1bed and 1bath
Bldg 1 New 2-story single family residence 4 bed/ 2.5 bath with attached carport covered porch covered patio and driveway