Project intelligenceTDLR TABS2019001503New Construction
Funding type

This project is privately funded, on private land for private use.

Waterford at Frisco Phase 2

John W. Elliot Dr & Enterprise Dr, Frisco, TX, 75033

Construction complete · Jun 2021Project Closed

Waterford at Frisco Phase 2 is a new construction project at John W. Elliot Dr & Enterprise Dr, Frisco, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $45.0M across about 512,471 sq ft.

Estimated project value
$45.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
512,471 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$88/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 21, 2018922 days across supplied datesJun 30, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    70 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    852 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75033 (Frisco)

One email per change. Unsubscribe in one click. Privacy.

Waterford at Frisco Phase 2 is a New Construction project located at John W. Elliot Dr & Enterprise Dr, Frisco, TX 75033 in Frisco, Texas. The project has an estimated value of $45.0M covering 512,471 sq ft. Stoneleigh Companies LLC is the property owner and EDI International, PC is the design firm of record. The project was registered with TDLR on December 21, 2018.

Frequently Asked Questions

What is Waterford at Frisco Phase 2?

Waterford at Frisco Phase 2 is a new construction project at John W. Elliot Dr & Enterprise Dr in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 5 Stories of Type 3B Multi-Family Residences with associated 5 Story Type 2A Parking Garage. Amenities include pool, pool deck, outdoor living, fitness, club, wifi lounge, leasing on Ground Floor and Sky Lounge on 5th floor.

Is Waterford at Frisco Phase 2 open in Frisco?

Construction on Waterford at Frisco Phase 2 is complete — TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.

Where is Waterford at Frisco Phase 2 located?

Waterford at Frisco Phase 2 is located at John W. Elliot Dr & Enterprise Dr, Frisco, TX, 75033, in Denton County.

Who is the owner or developer of Waterford at Frisco Phase 2?

Stoneleigh Companies LLC is the property owner/developer of record for Waterford at Frisco Phase 2, per its TDLR project registration.

Who is the architect or design firm for Waterford at Frisco Phase 2?

EDI International, PC is the design firm of record for Waterford at Frisco Phase 2, according to its TDLR filing.

How much does Waterford at Frisco Phase 2 cost and how big is it?

Waterford at Frisco Phase 2 has an estimated construction value of $45.0M and approximately 512,471 square feet (about $88/sqft), based on its TDLR filing.

Scope of Work

5 Stories of Type 3B Multi-Family Residences with associated 5 Story Type 2A Parking Garage. Amenities include pool, pool deck, outdoor living, fitness, club, wifi lounge, leasing on Ground Floor and Sky Lounge on 5th floor.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

John W. Elliot Dr & Enterprise Dr, Frisco, TX, 75033

Location by street address

Watch all construction in 75033 (Frisco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.