Project intelligenceTDLR TABS2019001598Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Bowman Middle School Refurbishment

2501 Jupiter Road, Plano, TX, 75074

Construction complete · Dec 2019Project Closed

Bowman Middle School Refurbishment is a renovation/alteration project at 2501 Jupiter Road, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $8.3M across about 168,000 sq ft.

Estimated project value
$8.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
168,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$49/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 24, 2018371 days across supplied datesDec 30, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    8 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    363 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75074 (Plano)

One email per change. Unsubscribe in one click. Privacy.

Bowman Middle School Refurbishment is a Renovation/Alteration project located at 2501 Jupiter Road, Plano, TX 75074 in Plano, Texas. The project has an estimated value of $8.3M covering 168,000 sq ft. Plano Independent School District--Tony Pearson is the property owner and WRA Architects, Inc. is the design firm of record. The project was registered with TDLR on December 24, 2018.

Frequently Asked Questions

What is Bowman Middle School Refurbishment?

Bowman Middle School Refurbishment is a renovation/alteration project at 2501 Jupiter Road in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This refurbishment will include new flooring, paint, replacement of ceiling grid/tiles and re-installation of existing lighting, urinals & wash fountains, toilet partitions and tile. Renovation of existing kitchen and installation of new…

Is Bowman Middle School Refurbishment open in Plano?

Construction on Bowman Middle School Refurbishment is complete — TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.

Where is Bowman Middle School Refurbishment located?

Bowman Middle School Refurbishment is located at 2501 Jupiter Road, Plano, TX, 75074, in Collin County.

Who is the owner or developer of Bowman Middle School Refurbishment?

Plano Independent School District--Tony Pearson is the property owner/developer of record for Bowman Middle School Refurbishment, per its TDLR project registration.

Who is the architect or design firm for Bowman Middle School Refurbishment?

WRA Architects, Inc. is the design firm of record for Bowman Middle School Refurbishment, according to its TDLR filing.

How much does Bowman Middle School Refurbishment cost and how big is it?

Bowman Middle School Refurbishment has an estimated construction value of $8.3M and approximately 168,000 square feet (about $49/sqft), based on its TDLR filing.

Scope of Work

This refurbishment will include new flooring, paint, replacement of ceiling grid/tiles and re-installation of existing lighting, urinals & wash fountains, toilet partitions and tile. Renovation of existing kitchen and installation of new exterior fr

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2501 Jupiter Road, Plano, TX, 75074

Location by street address

Watch all construction in 75074 (Plano)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Collin

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists