Project intelligenceTDLR TABS2019002606Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Farwell ISD Fieldhouse Addition

601 Ave. H, Farwell, TX, 79325

Construction complete · Jul 2020Project Closed

Farwell ISD Fieldhouse Addition is a additions to existing building project at 601 Ave. H, Farwell, in Parmer County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2020). The project has an estimated value of $800K across about 5,300 sq ft.

Estimated project value
$800K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
5,300 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$151/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 4mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 15, 2019547 days across supplied datesJul 15, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    62 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    485 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79325 (Farwell)

One email per change. Unsubscribe in one click. Privacy.

Farwell ISD Fieldhouse Addition is a Additions to Existing Building project located at 601 Ave. H, Farwell, TX 79325 in Farwell, Texas. The project has an estimated value of $800K covering 5,300 sq ft. Farwell Independent School District is the property owner and A+E Design Group, Inc. is the design firm of record. The project was registered with TDLR on January 15, 2019.

Frequently Asked Questions

What is Farwell ISD Fieldhouse Addition?

Farwell ISD Fieldhouse Addition is a additions to existing building project at 601 Ave. H in Farwell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition to the existing football field house including locker rooms, showers, restrooms, coaches offices, training room, and laundry room.

Is Farwell ISD Fieldhouse Addition open in Farwell?

Construction on Farwell ISD Fieldhouse Addition is complete — TDLR records show the project passed its required accessibility inspection in Jul 2020. The building is finished and very likely open.

Where is Farwell ISD Fieldhouse Addition located?

Farwell ISD Fieldhouse Addition is located at 601 Ave. H, Farwell, TX, 79325, in Parmer County.

Who is the owner or developer of Farwell ISD Fieldhouse Addition?

Farwell Independent School District is the property owner/developer of record for Farwell ISD Fieldhouse Addition, per its TDLR project registration.

Who is the architect or design firm for Farwell ISD Fieldhouse Addition?

A+E Design Group, Inc. is the design firm of record for Farwell ISD Fieldhouse Addition, according to its TDLR filing.

How much does Farwell ISD Fieldhouse Addition cost and how big is it?

Farwell ISD Fieldhouse Addition has an estimated construction value of $800K and approximately 5,300 square feet (about $151/sqft), based on its TDLR filing.

Scope of Work

Addition to the existing football field house including locker rooms, showers, restrooms, coaches offices, training room, and laundry room.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

601 Ave. H, Farwell, TX, 79325

34.38346, -103.03637

Watch all construction in 79325 (Farwell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.