Murchison Middle School Renovation & Addition
3700 North Hills Drive, Austin, TX, 78737
Murchison Middle School Renovation & Addition is a additions to existing building project at 3700 North Hills Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $18.0M across about 84,695 sq ft.
- Estimated project value
- $18.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 84,695 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $213/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
103 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
458 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78737 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Murchison Middle School Renovation & Addition is a Additions to Existing Building project located at 3700 North Hills Drive, Austin, TX 78737 in Austin, Texas. The project has an estimated value of $18.0M covering 84,695 sq ft. AISD is the property owner and Stantec is the design firm of record. The project was registered with TDLR on January 23, 2019.
Frequently Asked Questions
What is Murchison Middle School Renovation & Addition?
Murchison Middle School Renovation & Addition is a additions to existing building project at 3700 North Hills Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Enclosing existing open air court yard to be interior, partial renovation interior of existing, addition of 3 story academic wing.
Is Murchison Middle School Renovation & Addition open in Austin?
Construction on Murchison Middle School Renovation & Addition is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is Murchison Middle School Renovation & Addition located?
Murchison Middle School Renovation & Addition is located at 3700 North Hills Drive, Austin, TX, 78737, in Travis County.
Who is the owner or developer of Murchison Middle School Renovation & Addition?
AISD is the property owner/developer of record for Murchison Middle School Renovation & Addition, per its TDLR project registration.
Who is the architect or design firm for Murchison Middle School Renovation & Addition?
Stantec is the design firm of record for Murchison Middle School Renovation & Addition, according to its TDLR filing.
How much does Murchison Middle School Renovation & Addition cost and how big is it?
Murchison Middle School Renovation & Addition has an estimated construction value of $18.0M and approximately 84,695 square feet (about $213/sqft), based on its TDLR filing.
Scope of Work
Enclosing existing open air court yard to be interior, partial renovation interior of existing, addition of 3 story academic wing.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3700 North Hills Drive, Austin, TX, 78737
Related Projects
Same Owner
$97.1M totalRelated City Permits
Building permits found at or near this location
(Raykhel Ilya) - INSTALLATION OF CIRCUIT FOR ELEC. VEHICLE CHARGING STATION - ESIP
Replacement of complete existing central heat and air system with or without duct work
BASE: Installing a backup battery system and additional meter socket.
Addition of exterior storefront windows trellis and prefabricated canopy.
Replacement of an existing water heater Change out NG water heater like for like
Watch all construction in 78737 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.