DFW Southwest Consolidated Campus Phase 1B

3600 S. 20th Avenue, Dfw Airport, TX, 75261

Target date passed (Aug 2020)Project Registered

DFW Southwest Consolidated Campus Phase 1B is a new construction project at 3600 S. 20th Avenue, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $40.0M across about 300,000 sq ft.

Estimated project value
$40.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
300,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$133/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 8, 2019551 days across supplied datesAug 12, 2020

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    96 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    455 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

DFW Southwest Consolidated Campus Phase 1B is a New Construction project located at 3600 S. 20th Avenue, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $40.0M covering 300,000 sq ft. DFW Design, Code and Construction Department is the property owner and WSP USA is the design firm of record. The project was registered with TDLR on February 8, 2019.

Frequently Asked Questions

What is DFW Southwest Consolidated Campus Phase 1B?

DFW Southwest Consolidated Campus Phase 1B is a new construction project at 3600 S. 20th Avenue in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of various utilities, storm drains, street paving, sidewalks, street lighting and landscaping

Is DFW Southwest Consolidated Campus Phase 1B open in Dfw Airport?

DFW Southwest Consolidated Campus Phase 1B was scheduled to finish construction in Aug 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is DFW Southwest Consolidated Campus Phase 1B located?

DFW Southwest Consolidated Campus Phase 1B is located at 3600 S. 20th Avenue, Dfw Airport, TX, 75261, in Tarrant County.

Who is the owner or developer of DFW Southwest Consolidated Campus Phase 1B?

DFW Design, Code and Construction Department is the property owner/developer of record for DFW Southwest Consolidated Campus Phase 1B, per its TDLR project registration.

Who is the architect or design firm for DFW Southwest Consolidated Campus Phase 1B?

WSP USA is the design firm of record for DFW Southwest Consolidated Campus Phase 1B, according to its TDLR filing.

How much does DFW Southwest Consolidated Campus Phase 1B cost and how big is it?

DFW Southwest Consolidated Campus Phase 1B has an estimated construction value of $40.0M and approximately 300,000 square feet (about $133/sqft), based on its TDLR filing.

Scope of Work

Construction of various utilities, storm drains, street paving, sidewalks, street lighting and landscaping

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3600 S. 20th Avenue, Dfw Airport, TX, 75261

Location by street address

Watch all construction in 75261 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.