Project intelligenceTDLR TABS2019004616Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Amarillo ISD-2017 Bond Package #1

5600 SW 49th Avenue, Amarillo, TX, 79109

Construction complete · Aug 2020Project Closed

Amarillo ISD-2017 Bond Package #1 is a renovation/alteration project at 5600 SW 49th Avenue, Amarillo, in Randall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $1.8M across about 8,527 sq ft.

Estimated project value
$1.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
8,527 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$215/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 12, 2019549 days across supplied datesAug 14, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    122 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    427 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79109 (Amarillo)

One email per change. Unsubscribe in one click. Privacy.

Amarillo ISD-2017 Bond Package #1 is a Renovation/Alteration project located at 5600 SW 49th Avenue, Amarillo, TX 79109 in Amarillo, Texas. The project has an estimated value of $1.8M covering 8,527 sq ft. Amarillo Independent School District is the property owner and Parkhill, Smith & Cooper, Inc. is the design firm of record. The project was registered with TDLR on February 12, 2019.

Frequently Asked Questions

What is Amarillo ISD-2017 Bond Package #1?

Amarillo ISD-2017 Bond Package #1 is a renovation/alteration project at 5600 SW 49th Avenue in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Level 2 Alteration to existing locker rooms, Level 2 & 1 Alterations to restrooms, Level 1 Alterations for replacement of exterior doors and windows, improvements to site and vehicular circulation.

Is Amarillo ISD-2017 Bond Package #1 open in Amarillo?

Construction on Amarillo ISD-2017 Bond Package #1 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.

Where is Amarillo ISD-2017 Bond Package #1 located?

Amarillo ISD-2017 Bond Package #1 is located at 5600 SW 49th Avenue, Amarillo, TX, 79109, in Randall County.

Who is the owner or developer of Amarillo ISD-2017 Bond Package #1?

Amarillo Independent School District is the property owner/developer of record for Amarillo ISD-2017 Bond Package #1, per its TDLR project registration.

Who is the architect or design firm for Amarillo ISD-2017 Bond Package #1?

Parkhill, Smith & Cooper, Inc. is the design firm of record for Amarillo ISD-2017 Bond Package #1, according to its TDLR filing.

How much does Amarillo ISD-2017 Bond Package #1 cost and how big is it?

Amarillo ISD-2017 Bond Package #1 has an estimated construction value of $1.8M and approximately 8,527 square feet (about $215/sqft), based on its TDLR filing.

Scope of Work

Level 2 Alteration to existing locker rooms, Level 2 & 1 Alterations to restrooms, Level 1 Alterations for replacement of exterior doors and windows, improvements to site and vehicular circulation.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5600 SW 49th Avenue, Amarillo, TX, 79109

35.15637, -101.89677

Watch all construction in 79109 (Amarillo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Amarillo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.