GMF AOC-II Phase 5 Cafeteria Remodel
GMF AOC-II Phase 5 Cafeteria Remodel is a renovation/alteration project at 4000 Embarcadero Dr, Arlington, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2019). The project has an estimated value of $1.8M across about 11,722 sq ft.
๐Project Metrics
TDLR #TABS2019005100Project Closed
Project has been completed and closed
GMF AOC-II Phase 5 Cafeteria Remodel is a Renovation/Alteration project located at 4000 Embarcadero Dr, Arlington, TX 76016 in Arlington, Texas. The project has an estimated value of $1.8M covering 11,722 sq ft. Tom Lehrman is the property owner and MULTATECH is the design firm of record. The project was registered with TDLR on February 18, 2019.
โFrequently Asked Questions
What is GMF AOC-II Phase 5 Cafeteria Remodel?
GMF AOC-II Phase 5 Cafeteria Remodel is a renovation/alteration project at 4000 Embarcadero Dr in Arlington, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing cafeteria space and addition on an outdoor pergola structure.
Is GMF AOC-II Phase 5 Cafeteria Remodel open in Arlington?
Construction on GMF AOC-II Phase 5 Cafeteria Remodel is complete โ TDLR records show the project passed its required accessibility inspection in Sep 2019. The building is finished and very likely open.
Where is GMF AOC-II Phase 5 Cafeteria Remodel located?
GMF AOC-II Phase 5 Cafeteria Remodel is located at 4000 Embarcadero Dr, Arlington, TX, 76016, in Tarrant County.
Who is the owner or developer of GMF AOC-II Phase 5 Cafeteria Remodel?
Tom Lehrman is the property owner/developer of record for GMF AOC-II Phase 5 Cafeteria Remodel, per its TDLR project registration.
Who is the architect or design firm for GMF AOC-II Phase 5 Cafeteria Remodel?
MULTATECH is the design firm of record for GMF AOC-II Phase 5 Cafeteria Remodel, according to its TDLR filing.
How much does GMF AOC-II Phase 5 Cafeteria Remodel cost and how big is it?
GMF AOC-II Phase 5 Cafeteria Remodel has an estimated construction value of $1.8M and approximately 11,722 square feet (about $150/sqft), based on its TDLR filing.
๐Scope of Work
Renovation of an existing cafeteria space and addition on an outdoor pergola structure.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 18, 2019
Review Complete
Inspection Complete
Closed
Sep 4, 2019