4900 GROVER OFFICE
4900 GROVER OFFICE is a renovation/alteration project at 1200 West 49th Street, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2020). The project has an estimated value of $200K across about 2,013 sq ft.
๐Project Metrics
TDLR #TABS2019007356Project Closed
Project has been completed and closed
4900 GROVER OFFICE is a Renovation/Alteration project located at 1200 West 49th Street, Austin, TX 78756 in Austin, Texas. The project has an estimated value of $200K covering 2,013 sq ft. MICHAEL POLOMBO is the property owner and m(odom) Mark Odom Studio is the design firm of record. The project was registered with TDLR on March 19, 2019.
โFrequently Asked Questions
What is 4900 GROVER OFFICE?
4900 GROVER OFFICE is a renovation/alteration project at 1200 West 49th Street in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel of 1143 SF building and addition of 870 sf.
Is 4900 GROVER OFFICE open in Austin?
Construction on 4900 GROVER OFFICE is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2020. The building is finished and very likely open.
Where is 4900 GROVER OFFICE located?
4900 GROVER OFFICE is located at 1200 West 49th Street, Austin, TX, 78756, in Travis County.
Who is the owner or developer of 4900 GROVER OFFICE?
MICHAEL POLOMBO is the property owner/developer of record for 4900 GROVER OFFICE, per its TDLR project registration.
Who is the architect or design firm for 4900 GROVER OFFICE?
m(odom) Mark Odom Studio is the design firm of record for 4900 GROVER OFFICE, according to its TDLR filing.
How much does 4900 GROVER OFFICE cost and how big is it?
4900 GROVER OFFICE has an estimated construction value of $200K and approximately 2,013 square feet (about $99/sqft), based on its TDLR filing.
๐Scope of Work
Remodel of 1143 SF building and addition of 870 sf.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 19, 2019
Review Complete
Inspection Complete
Closed
Feb 15, 2020
๐Related City Permits
Building permits found at or near this location
Electrical meter installation for New Construction of SFR in the ETJ 1230 sq ft
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
Replace existing cast iron drain piping located beneath the residence with new PVC drain piping. Work will include tunneling beneath the structure as necessary to access and replace only the existing underground drain lines under the house. No yard line replacement or exterior sewer line replacement is included in this scope of work.
15 DAY - MULTI-LEVEL DEMO AND REMODEL OF ADMINISTRATIVE OFFICE SPACE PHASE 2 - OVA
New construction of 2 story sfr with 3 beds 2.5 baths attached 2 car garage covered entry porch and rear patio