Project intelligenceTDLR TABS2019007378Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

HEB-DC Engineering Equipment Replacement - Mission 226 in Ennis, TX

820 S Conway, Ennis, TX, 78572

Target date passed (Jul 2019)Review Complete

HEB-DC Engineering Equipment Replacement - Mission 226 is a renovation/alteration project at 820 S Conway, Ennis, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2019 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $50K across about 500 sq ft.

Estimated project value
$50K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$100/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 19, 2019134 days across supplied datesJul 31, 2019

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    103 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78572 (Ennis)

One email per change. Unsubscribe in one click. Privacy.

HEB-DC Engineering Equipment Replacement - Mission 226 is a Renovation/Alteration project located at 820 S Conway, Ennis, TX 78572 in Ennis, Texas. The project has an estimated value of $50K covering 500 sq ft. HEB Grocery Group is the property owner and pb2 architecture + engineering is the design firm of record. The project was registered with TDLR on March 19, 2019.

Frequently Asked Questions

What is HEB-DC Engineering Equipment Replacement - Mission 226?

HEB-DC Engineering Equipment Replacement - Mission 226 is a renovation/alteration project at 820 S Conway in Ennis, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace bakery/deli freezer

Is HEB-DC Engineering Equipment Replacement - Mission 226 open in Ennis?

HEB-DC Engineering Equipment Replacement - Mission 226 was scheduled to finish construction in Jul 2019 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is HEB-DC Engineering Equipment Replacement - Mission 226 located?

HEB-DC Engineering Equipment Replacement - Mission 226 is located at 820 S Conway, Ennis, TX, 78572, in Ellis County.

Who is the owner or developer of HEB-DC Engineering Equipment Replacement - Mission 226?

HEB Grocery Group is the property owner/developer of record for HEB-DC Engineering Equipment Replacement - Mission 226, per its TDLR project registration.

Who is the architect or design firm for HEB-DC Engineering Equipment Replacement - Mission 226?

pb2 architecture + engineering is the design firm of record for HEB-DC Engineering Equipment Replacement - Mission 226, according to its TDLR filing.

How much does HEB-DC Engineering Equipment Replacement - Mission 226 cost and how big is it?

HEB-DC Engineering Equipment Replacement - Mission 226 has an estimated construction value of $50K and approximately 500 square feet (about $100/sqft), based on its TDLR filing.

Scope of Work

Replace bakery/deli freezer

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

820 S Conway, Ennis, TX, 78572

Loading location map…
26.21375, -98.32595

Watch all construction in 78572 (Ennis)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.