McDermott
McDermott is a renovation/alteration project at 915 N. Eldridge Parkway, Suite 300, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2019). The project has an estimated value of $2.8M across about 28,302 sq ft.
๐Project Metrics
TDLR #TABS2019008522Project Closed
Project has been completed and closed
McDermott is a Renovation/Alteration project located at 915 N. Eldridge Parkway, Suite 300, Houston, TX 77079 in Houston, Texas. The project has an estimated value of $2.8M covering 28,302 sq ft. TCH ENERGY CORRIDOR VENTURE LLC is the property owner and INVENTURE DESIGN is the design firm of record. The project was registered with TDLR on April 3, 2019.
โFrequently Asked Questions
What is McDermott?
McDermott is a renovation/alteration project at 915 N. Eldridge Parkway, Suite 300 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: INTERIOR BUILD OUT OF SHELL SPACE
Is McDermott open in Houston?
Construction on McDermott is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2019. The building is finished and very likely open.
Where is McDermott located?
McDermott is located at 915 N. Eldridge Parkway, Suite 300, Houston, TX, 77079, in Harris County.
Who is the owner or developer of McDermott?
TCH ENERGY CORRIDOR VENTURE LLC is the property owner/developer of record for McDermott, per its TDLR project registration.
Who is the architect or design firm for McDermott?
INVENTURE DESIGN is the design firm of record for McDermott, according to its TDLR filing.
How much does McDermott cost and how big is it?
McDermott has an estimated construction value of $2.8M and approximately 28,302 square feet (about $99/sqft), based on its TDLR filing.
๐Scope of Work
INTERIOR BUILD OUT OF SHELL SPACE
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 3, 2019
Review Complete
Inspection Complete
Closed
Oct 1, 2019